.Seneca H-IV Vfine Phase 1 Bond Release
<br />l? rqe 2
<br />Section 22:
<br />Section 23:
<br />Section 26:
<br />Section 27:
<br />Section 34:
<br />Section 35:
<br />TG 88
<br />Section 14:
<br />Section 23:
<br />Section 24:
<br />TAN_ &7W
<br />Section 17:
<br />Section 18:
<br />Section 19:
<br />NW'/., NEV., N1/2SE'/, , SW'/4SF.',/., Portions of N'/2SW'/4, and SW ASE!%
<br />NW'/., SW'/., W',/2E /z, and W'/2E', 2E'/s
<br />W'/i, W/2E'./2, and Portions of W'/20/2NE'/? and W'/2E'/2SF,!/,
<br />1'%i
<br />NE'/., N'/2SE'/4, and Portions of N1 ,'2 S'/2SE1/4
<br />NW'/., W'/2NE'/4, N'/2SW'/4 and Portions of N' O/2SW?/.,
<br />NW/.SE',/., NXV/4SW/,SE';',, NW/4NE',i.SE!-'4, and W2E'/AE'/.
<br />Tie Across Ha il RoW
<br />Portions of SE'/., SW'/4
<br />Portions of N'ii
<br />Portions of NE!-:, NW'4
<br />Tie Across Haul Road
<br />Portions of SW'/., SEA, NE'/.
<br />Portions of SE'/.
<br />Portions of N'/2
<br />(The bond nleave arra doer not inelmde any of the Tie -A, rs Haxl Road wmdor, only selea atns within the mine ana)
<br />All located west of the 6th Principal Meridian; totaling 4,093 acres. The USGS 7.5 Minute Quadrangle Maps
<br />of Hayden Gulch, Hayden, Dunckley, and Mt. Harris, contain the described permit area.
<br />SCC is applying for Phase I release on 1,166.2 acres. A reclamation bond in the amount of $11,117,348 is
<br />currently in place of which $4,864,928 are being requested
<br />for release.
<br />Pursuant to Rule 3.03.1, a permittee may request Phase I Bond release upon successful completion of
<br />backfilling, regrading and drainage control in accordance with the approved reclamation plan. For the
<br />purposes of this Phase I Bond Release request, the term "reclaimed" means those disturbed/mined areas
<br />where successful completion of backfilling, regrading and drainage control, in accordance with the approved
<br />reclamation plan, has been completed. The areas requested for bond release were backftlled and graded from
<br />the beginning of mining, in 1990 through 2008 in accordance with the Colorado Division of Reclamation,
<br />Mining and Safety (CDRMS) rules and regulations.
<br />The Phase I reclamation activities have produced a stable landform in compliance with the approved
<br />conditions in the CDRMS Permit No. C-82.057. The majority of the grading work was performed with
<br />dozers and scrapers. In some cases the major backfilling was done with draglines. All areas affected by the
<br />surface mining operations, except as specifically exempted by the CDRMS, were regraded on a timely basis to
<br />a stable configuration that conforms to the approved post-mine land use (livestock gracing and wildlife
<br />habitat). Rill and gully surveys are conducted annually in the spring of each year to identify areas that have
<br />experienced severe erosion or other signs of instability during spring runoff from snowmelt and precipitation
|