Laserfiche WebLink
.Seneca H-IV Vfine Phase 1 Bond Release <br />l? rqe 2 <br />Section 22: <br />Section 23: <br />Section 26: <br />Section 27: <br />Section 34: <br />Section 35: <br />TG 88 <br />Section 14: <br />Section 23: <br />Section 24: <br />TAN_ &7W <br />Section 17: <br />Section 18: <br />Section 19: <br />NW'/., NEV., N1/2SE'/, , SW'/4SF.',/., Portions of N'/2SW'/4, and SW ASE!% <br />NW'/., SW'/., W',/2E /z, and W'/2E', 2E'/s <br />W'/i, W/2E'./2, and Portions of W'/20/2NE'/? and W'/2E'/2SF,!/, <br />1'%i <br />NE'/., N'/2SE'/4, and Portions of N1 ,'2 S'/2SE1/4 <br />NW'/., W'/2NE'/4, N'/2SW'/4 and Portions of N' O/2SW?/., <br />NW/.SE',/., NXV/4SW/,SE';',, NW/4NE',i.SE!-'4, and W2E'/AE'/. <br />Tie Across Ha il RoW <br />Portions of SE'/., SW'/4 <br />Portions of N'ii <br />Portions of NE!-:, NW'4 <br />Tie Across Haul Road <br />Portions of SW'/., SEA, NE'/. <br />Portions of SE'/. <br />Portions of N'/2 <br />(The bond nleave arra doer not inelmde any of the Tie -A, rs Haxl Road wmdor, only selea atns within the mine ana) <br />All located west of the 6th Principal Meridian; totaling 4,093 acres. The USGS 7.5 Minute Quadrangle Maps <br />of Hayden Gulch, Hayden, Dunckley, and Mt. Harris, contain the described permit area. <br />SCC is applying for Phase I release on 1,166.2 acres. A reclamation bond in the amount of $11,117,348 is <br />currently in place of which $4,864,928 are being requested <br />for release. <br />Pursuant to Rule 3.03.1, a permittee may request Phase I Bond release upon successful completion of <br />backfilling, regrading and drainage control in accordance with the approved reclamation plan. For the <br />purposes of this Phase I Bond Release request, the term "reclaimed" means those disturbed/mined areas <br />where successful completion of backfilling, regrading and drainage control, in accordance with the approved <br />reclamation plan, has been completed. The areas requested for bond release were backftlled and graded from <br />the beginning of mining, in 1990 through 2008 in accordance with the Colorado Division of Reclamation, <br />Mining and Safety (CDRMS) rules and regulations. <br />The Phase I reclamation activities have produced a stable landform in compliance with the approved <br />conditions in the CDRMS Permit No. C-82.057. The majority of the grading work was performed with <br />dozers and scrapers. In some cases the major backfilling was done with draglines. All areas affected by the <br />surface mining operations, except as specifically exempted by the CDRMS, were regraded on a timely basis to <br />a stable configuration that conforms to the approved post-mine land use (livestock gracing and wildlife <br />habitat). Rill and gully surveys are conducted annually in the spring of each year to identify areas that have <br />experienced severe erosion or other signs of instability during spring runoff from snowmelt and precipitation