.S'enew ILW Mine Phuse 1 Bond Release
<br />l ige 2
<br />ev Section 22:
<br />Section 23:
<br />Section 26:
<br />Section 27:
<br />Section 34:
<br />Section 35:
<br />1:68
<br />Section 14:
<br />Section 23:
<br />Section 24:
<br />TNR7W
<br />Section 17:
<br />Section 18:
<br />Section 19:
<br />NW'/,, NE'/,, N'/,SE-/, , SW'/,SE'./,, Portions of N'/zSW'/,, and SW'/4SF.'/4
<br />NW'./., SW'/4, W ,'/2E/2, and W'/20E /z
<br />W'/z, W,/2E'/2, and Portions of W'/2E''2NE1/4 and W'/20/2SE';,4
<br />E,'.z
<br />NE'/., N'/2SE'/4, and Portions of N'/ZS' zSE'/.
<br />NW /,, W'/.- NE/,, N'/2SW',% and Portions of W/2S'/zSW',/4,
<br />NW';%SE'/,, NV(/',',SW''SE'",, NW,%NEi4SEi4, and W','2E,/2NE'.4
<br />Tie Ac*?as I-] Road
<br />Portions of SE'/,, SW'/4
<br />Portions of N'/z
<br />Portions of NE'./., Mr/',
<br />Tie Acro FIa I Road ,
<br />Portions of SW'/., SE'/,, NE'/,
<br />Portions of SE'/,
<br />Portions of N'/s
<br />(The bond irlease ana doer not include axe- of the Tit _4,mss Haul Road mmdor, only select acrrs within the mine ana)
<br />All located west of the 6th Principal Meridian; totaling 4,093 acres. The USGS 7.5 Minute Quadrangle Maps
<br />of Hayden Gulch, Hayden, Dunckley, and Mt. Harris, contain the described permit area.
<br />SCC is applying for Phase I release on 1,166.2 acres. A reclamation bond in the amount of;11,117,348 is
<br />currently in place of which $4,864,928 are being requested for release.
<br />Pursuant to Rule 3.03.1, a permittee may request Phase I Bond release upon successful completion of
<br />backfilling, regrading and drainage control in accordance with the approved reclamation plan. For the
<br />purposes of this Phase I Bond Release request, the term "reclaimed" means those disturbed/mined areas
<br />where successful completion of backfilling, regrading and drainage control, in accordance with the approved
<br />reclamation plan, has been completed. The areas requested for bond release were backfilled and graded from
<br />the beginning of reining, in 1990 through 2008 in accordance with the Colorado Division of Reclamation,
<br />Mining and Safety (CDRINIS) rules and regulations.
<br />The Phase I reclamation activities have produced a stable landform in compliance with the approved
<br />conditions in the CDRMS Permit No. C-82-057. The majority of the grading work was performed with
<br />dozers and scrapers. In some cases the major backfilling was done with draglines. All areas affected b
<br />the
<br />surface mining operations, except as specifically exempted by the CDRNfS, were regraded on a timely basis to
<br />a stable configuration that conforms to the approved post-mine land use (livestock grazing and wildlife
<br />habitat). Rill and gully curve s ar d
<br />y e con ucted annually to the spring of each year to identify areas that have
<br />0 experienced severe erosion or other signs of instability during spring runoff from snowmelt and precipitation
|