Laserfiche WebLink
.Seneca II-W Aline Phase I Bond Release <br />Aige 2 <br />Section 22: <br />Section 23: <br />Section 26: <br />Section 27: <br />Section 34: <br />Section 35: <br />i6N U M <br />Section 14: <br />Section 23: <br />Section 24: <br />Section 17: <br />Section 18: <br />Section 19: <br />NW'/., NE'/., N'/2SE'./, , SW',/.SF.'.i., Portions of NV2SW'/+, and SW /;SE". <br />NW'/4, SW'/., W'/2E,/2, and W', 2E'//20,/z <br />W'/z, W/2 E/2, and Portions of W',A- 2W/! and W /2E'/2SE'/. <br />E V2 <br />NE'/., N /,2SF.',%, and Portions of N'/2S'/2SE'/4 <br />NWA, W' ENE'/., W/2SW'/4 and Portions of N'/2S'/2SW/4, <br />NW'.%SE'/., NW'/4SW14SE'/4, NBC",;NE'/.SE',%, and kV/2E',iNE1,: <br />Tie A X= Ia 1 Road <br />Portions of SE'/., SW'/. <br />Portions of N'/z <br />Portions of NE!/., NXV <br />Tie Across Hain Road <br />Portions of SW'/., SE'/., NE'/. <br />Portions of SE'/. <br />Portions of N'/z <br />(The bond release area does not include any of the Tie :Across Haul Road cnrrrdor, only .relea acmr within the mine area) <br />All located west of the 6th Principal Meridian; totaling 4,093 acres. The USGS 7.5 Minute Quadrangle Maps <br />of Hayden Gulch, Hayden, Dunckley, and Mt. Harris, contain the described permit area. <br />SCC is applying for Phase I release on 1,166.2 acres. A reclamation bond in the amount of $11,117,348 is <br />currently in place of which $4,864,928 are being requested for release. <br />Pursuant to Rule 3.03.1, a permittee may request Phase I Bond release upon successful completion of <br />backfilling, regrading and drainage control in accordance with the approved reclamation plan. For the <br />purposes of this Phase I Bond Release request, the term "reclaimed" means those disturbed/mined areas <br />where successful completion of backfilling, regrading and drainage control, in accordance with the approved <br />reclamation plan, has been completed. The areas requested for bond release were backfilled and graded from <br />the beginning of mining, in 1990 through 2008 in accordance with the Colorado Division of Reclamation, <br />Mining and Safety (CDR-MS) rules and regulations. <br />The Phase I reclamation activities have produced a stable landform in compliance with the approved <br />conditions in the CDRMS Permit No. C-82.057. The majority of the grading work was performed with <br />dozers and scrapers. In some cases the major backfilling was done with draglines. All areas affected by the <br />surface mining operations, except as specifically exempted by the CDRMS, were regraded on a timely basis to <br />a stable configuration that conforms to the approved post-mine land use (livestock grazing and wildlife <br />habitat). Rill and gully surveys are conducted annually in the spring of each year to identify areas that have <br />experienced severe erosion or other signs of instability during spring runoff from snowmelt and precipitation