,Veneta II-IV Aline Phare I Bond Release
<br />Page 2
<br />Section 22:
<br />Section 23:
<br />Section 26:
<br />Section 27:
<br />Section 34:
<br />Section 35:
<br />T6N. R88M
<br />Section 14:
<br />Section 23:
<br />Section 24:
<br />'I'6N. R87W
<br />Section 17:
<br />Section 18:
<br />Section 19:
<br />NW'/,, NE'/., N1/2SE1/. , SW'./.SE'/., Portions of N'.%SW'/., and SW'/,SE:'/.
<br />NW'/., SW'/., W,/2E/2, and W'./2E'/2E'/2
<br />W'/:, W'/2E'/2, and Portions of W'/2E'/2NE'/4 and W'/zE"zSE'/.
<br />E'z
<br />NE'/., N'/2SE'/4, and Portions of N /2S'/2SE!%
<br />NW'/., W'/2NE!/4, N'/2SW'/4 and Portions of N'/2S'/2SW/4,
<br />NWI/.SE'/., NW'./4SW :SE',/., NW',/.NE',/.SE',/., and W/2E'; ENE'/+
<br />Tie Across Haul Road
<br />Portions of SE'/., SW'/.
<br />Portions of N'/s
<br />Portions of NE!/., NW'/',
<br />Tie Across Haul Road
<br />Portions of SW /., SE'/., NE'/.
<br />Portions of SE'/.
<br />Portions of N'/s
<br />(The band nleare ana doer not include any of the Tie,,hmss Haul Road corridor, only select aces within the mine ana)
<br />All located west of the 6th Principal Meridian; totaling 4,093 acres. The USGS 7.5 Minute Quadrangle Maps
<br />of Hayden Gulch, Hayden, Dunckley, and Mt. Harris, contain the described permit area
<br />SCC is applying for Phase I release on 1,166.2 acres. A reclamation bond in the amount of $11,117,348 is
<br />currently in place of which $4,864,928 are being requested for release.
<br />Pursuant to Rule 3.03.1, a permittee may request Phase I Bond release upon successful completion of
<br />backfilling, regrading and drainage control in accordance with the approved reclamation plan. For the
<br />purposes of this Phase I Bond Release request, the tern "reclaimed" means those disturbed/mined areas
<br />where successful completion of backfilling, regrading and drainage control, in accordance with the approved
<br />reclamation plan, has been completed. The areas requested for bond release were backfilled and graded from
<br />the beginning of mining, in 1990 through 2008 in accordance with the Colorado Division of Reclamation,
<br />Mining and Safety (CDRMS) rules and regulations.
<br />The Phase I reclamation activities have produced a stable landform in compliance with the approved
<br />conditions in the CDRNfS Permit No. C-82-057. The majority of the grading work was performed with
<br />dozers and scrapers. In some cases the major backfilling was done with draglines. All areas affected by the
<br />surface mining operations, except as specifically exempted by the CDRMS, were regraded on a timely basis to
<br />a stable configuration that conforms to the approved post-mine land use (livestock grazing and wildlife
<br />habitat). Rill and gully surveys are conducted annually in the spring of each car to identify areas that have