My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-08-14_REVISION - M1980003
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980003
>
2009-08-14_REVISION - M1980003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:24 AM
Creation date
8/14/2009 1:30:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980003
IBM Index Class Name
REVISION
Doc Date
8/14/2009
Doc Name
FW increase
From
DRMS
To
Quarter Circle 8 LLLC
Type & Sequence
SI2
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinq Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 003 State :Colorado Permit/job# :M1980003 <br />Date : 0811012009 County :Eagle Abbreviation :none <br />User: PSH Site :Mcnulty Cinder Pit Filename : M003-003 <br />Agency or organization name : Colorado Department Of Reclamation, Mining And Safety <br />Permit or other job action :Revised Bond Calculation <br />Task description : Spread all available growth medium (topsoil and fines) over site <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series 11- 8SU (200,1 Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 : BOPS Cab Shiftbasis : 1 per day <br />Attachment no. 2 :NA <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $48.29 NA <br />Operating cost/hour : $94.84 100 <br />Ripper op. cost/hour : $0.00 NA <br />Operator cost/hour : $35.01 NA <br />Total unit cost/hour : $178.15 Total fleet cost/hour : $178.15 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,500 LCY factor : NA volume : 2,500 LCY <br />Source of estimated volume :div <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Average push distance : 300 feet Material consistency : <br />Unadjusted hourly production : 291.4 LCY/hr Dozing method : <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description : <br />Job Condition Correction Factors <br />Operator skill : <br />Visibility : <br />Job efficiency : <br />Spoil pile: <br />Push gradient <br />10.00 % (pos) Altitude : <br />7,500 feet Material weight : <br /> Blade type <br />1,600 Ibs/LCY Net correction <br />0.75 <br />1.00 <br />1.00 <br />1.00 <br />0.83 <br />1.00 <br />0.79 <br />1.00 <br />1.44 <br />1.00 <br />0.70 <br />Source <br />HB) <br />(Cat HB) <br />(Cat HB) <br />Top Soil Adjusted unit production : 205.08 LCY/hr <br />Adjusted fleet production : 205.08 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 12.19 Hours <br />Unit cost : $0.869 /LCY Total job cost : $2,172
The URL can be used to link to this page
Your browser does not support the video tag.