My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-08-12_INSPECTION - M1999006
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1999006
>
2009-08-12_INSPECTION - M1999006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:49:42 PM
Creation date
8/13/2009 2:31:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999006
IBM Index Class Name
INSPECTION
Doc Date
8/12/2009
Doc Name
Insp Rpt
From
DRMS
To
Sand Land, Inc.
Inspection Date
7/21/2009
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Page 3) <br />MINE ID # OR PROSPECTING ID #: M-1999-nob <br />INSPECTION DATE: 7/91-Ing INSPECTOR=S INITIALS: MAC' <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified <br />during this inspection. The problems should be corrected by the dates given, or they will become possible <br />violations. The possible violations should be corrected by the dates given to reduce their severity when considered <br />by the Mined Land Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />The Operator has failed to notify the Division of changes to the Mining and Reclamation DATE 9/4 /09 <br />Plans. The Construction Materials Rules and Regulations define a Technical Revision as: a <br />change in the permit which does not have more than a minor effect upon the approved <br />Reclamation Plan. Rule 1.9.1 requires that an application for Technical Revision be <br />filed in writing to the Division <br />Corrective actions are to: <br />The Operator shall submit a Technical Revision addressing the following changes to the <br />Reclamation Plan: relocation of the topsoil stockpile, relocation of the wash pond, relocation <br />of the high pressure gas line, and relocation of the seep ditch. In addition, the Technical <br />PB or PV: PR <br />TOPIC(S): oMP <br />RS <br />Revision shall address the change from six individual reservoirs to a single reservoir. The <br />Technical Revision shall be submitted to the Division on or before September 4, 2009
The URL can be used to link to this page
Your browser does not support the video tag.