Laserfiche WebLink
CIRCES Cost Estimating Software <br />DIRECT COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />• <br />Date : 30-Jan-2009 Permit or job no. C-1981-018 Site :Deserado Mine <br />User : JDM Abbreviation : none State : Colorado <br />Task : OOG Filename: C018-0OG County •Rio Blanco <br />• <br />• <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or job action :Renewal 5 <br />Task description : Topsoil Replacement Tasks - Tasks 070-089 <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />070 -Replace Topsoil from Stockpile to D-Portal Area scraperl 3 29.2 $55,021 <br />071 -Replace Topsoil from Stockpile to East and West Haul Roads scraperl 3 22.4 $4Z247 <br />072 -Replace Topsoil from Stockpile to RP-21314 scraperl 3 63.2 $ <br />118,877 <br />073 -Replace Topsoil from Stockpile to RP-1 scraperl 3 13.9 __ <br />$ <br />26,185 <br />074 -Replace Topsoil from Stockpile to RP-5a scraperl 3 96.01 _ <br />$180,404 <br />076 -Replace Topsoil from Stockpile to Regade Slot Storage Area scraperl 3 1.5 $ <br />2,954 <br />077 -Replace Topsoil from Stockpile to Alluvial Well Area scraperl 3 0.4 __ <br />$858 <br />078 -Replace Topsoil from Stockpile to Overland Conveyor Corridor scraperl 3 7.5 ?W $14,183 <br />___080 -Load and Place Topsoil from D-Portal to East Portal Vent Shaft and Roa truckl 1 4.31 _ <br />? <br />$2, 983 <br />081 -Replace Topsoil from Stockpile to Drill Pads from MR's and TR s dozer 4 11.2 _ <br />$9,298 <br />082 -Replace Topsoil from Stockpile to Access Roads dozer 4 2.81 $2,332 <br />083 -Replace Tiopsoil from Stockpile to Pond RP-5a dozer 4 3.1 _ <br />$Z621 <br />__084_ -Replace Topsoil from Stockkpile to Drill Pads, Ponds, Flow Cells and Dit dozer 4 3.4 $2, 896 <br />- 085 <br />--- -Replace Topsoil from Stockpile to Rock Dust Facility dozer 4 0.2 $188 <br /> <br />086 <br />-Replace Topsoil from Stockpile to Pond, Road and Lay Down Area <br />dozer <br />4 <br />0.61 -----------_--- <br />$509 <br />087 -Replace Topsoil from Stockpile to B-Seam Vent Shaft and Access Road scraperl 3 0.6 $1,166 <br />088 -Replace Topsoil from Stockpile to Drill Pads and Roads from TR-44 dozer 4 1.8 _ _ <br />$1,539 <br />089 -Replace Topsoil from Stockpile to Light Use Road to RDH-3 dozer 4 a25 $210 <br /> --__ <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS : 263.0 $464,471