My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-18_PERMIT FILE - C1981018A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981018A
>
2009-06-18_PERMIT FILE - C1981018A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:55 PM
Creation date
8/13/2009 1:59:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018A
IBM Index Class Name
Permit File
Doc Date
6/18/2009
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Illustration 47
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 082 State : Colorado Permit/job# : C-1981-018 _ <br />Date : 0112712009 County: Rio Blanco Abbreviation :none <br />User: <br />JDM <br />Site: Deserado Mine <br />Filename :C018-082 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Renewal 5 <br />Task description :Replace Topsoil from Stockpile to Access Roads <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br /> Utilization % <br /> Cost Breakdown : Ownership cost/hour : $71.49 NA <br /> Operating cost/hour : $103.27 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $207.53 Total fleet cost/hour: - $830.14 <br /> MATERIAL QUANTITIES <br />• Initial Swell Loose <br /> volume : 7,093 CCY factor : 1.111 volume : 8,880 LCY <br /> <br /> Source of estimate d volume :Operator Estimate incl MR's 134-135, 137, TR 64 _ <br /> Source of estimated swell factor :Operator Study <br /> <br /> HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br /> Average push distance : 75 feet Material consistency : 1.00 (Cat HB <br />) <br /> <br />Unadjusted hourly production : <br />1,514.3 LCY/hr <br />Dozing method : <br />1.00 _ <br />_ <br />(gen.) <br /> Visibility : 1.00 (avg.) <br /> Material consistency description : Job efficiency : 0.83 (1shift/day) <br /> Consolidated stockpile Spoil pile : 0.93 (user) <br /> Push gradient : 1.00 _ <br />(Cat HB) <br /> <br />Average push gradient : <br />0.00 % (pos) <br />Altitude : <br />1.00 _ <br />(Cat HB) <br /> Average site altitude : 5,300 feet Material weight : 0.90 (Cat HB)_ <br /> Blade type : 1.00 (S/SU/U) <br /> Material weight : 2,550 Ibs/LCY Net correction : 0.52 <br /> Weight description <br /> Earth - Dry packed Adjusted unit production : 790.43 LCY/hr <br /> Adjusted fleet production : 3461.73 LCY/hr <br /> <br /> <br />• JOB TIME AND COST <br />Fleet size : <br />4 Dozer(s) <br />Total job time : <br />2.81 <br />Hours <br /> Unit cost : $0.263 /LCY Total job cost : $2,332 <br />
The URL can be used to link to this page
Your browser does not support the video tag.