Laserfiche WebLink
sheet l of 2 <br />CIRCES Cost Estimating Software <br />• SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name : Colorado Division of Reclamation, Mining And Safety <br />077 State : Colorado Permitijob #: C-1981-018 <br />0112712009 County: Rio Blanco Abbreviation :none <br />JDM Site : Deserado Mine Filename : C018-077 <br />Permit or other job action :Renewal 5 <br />Task description :Replace Topsoil from Stockpile to Alluvial Well Area <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Equipment Description <br />Scraper work team -Scraper : Cat 637G w/push-pull <br />-Push dozer: NA <br />Support equipment -Load area : NA <br />-Dump area : NA <br />Road maintenance -Motor grader : NA <br />-Water truck :NA <br />• Cost Bri <br />!akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA NA NA <br />% Utilization-machine : 100 NA NA NA NA NA <br /> <br />-Ripper attachment : <br />NA <br />NA <br />NA <br />NA <br />NA ------------------- <br />NA <br />Ownerhip cost/hour : $110.37 NA NA NA NA NA <br />Operating cost/hour : $177.86 NA NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $24.95 NA NA NA NA NA <br />Unit subtotals : $313.18 NA NA NA NA NA <br />Number of units : 6 0 0 0 0 0 <br />Group subtotals : Work : $1,879.06 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $1.879.06 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,450 CCY factor : 1.111 volume : 1,611 LCY <br />Source of quantity take-off :Permit Volume IV <br />• Source of estimated swell factor :Operator Study