Laserfiche WebLink
sheet 1 of 2 <br />• <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User: <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />073 State :Colorado Permit/job # : C-1981-018 <br />0112712009 County: Rio Blanco Abbreviation :none <br />JDM Site : Deserado Mine Filename : C018-073 <br />Permit or other job action :Renewal 5 <br />Task description : Replace Topsoil from Stockpile to RP-1 <br />HOURLY EQUIPMENT COST <br />uipment <br />• Cost Bra <br />Shift basis:- 1 per day <br />Scraper work team -Scraper :Cat 637G w/push pull <br />-Push dozer:NA <br />Support equipment -Load area : NA <br />-Dump area :NA <br />Road maintenance -Motor grader : NA <br />-Water truck I NA ------ . <br />iakdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA NA NA <br />% Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA _ <br />NA <br />Ownerhip cost/hour : $110.37 NA NA NA NA NA <br />Operating cost/hour : $177.86 NA NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA ?NA u <br />Operator cost/hour : $24.95 NA NA NA NA NA <br />Unit subtotals : $313.18 NA NA NA NA NA <br />Number of units : 6 0 0 0 0 0 <br />Group subtotals : Work : $1,879.06 Support: $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $1.879-06 <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume : 41,995 CCY factor : 1.111 <br />Loose <br />volume : 46,656 LCY <br />Source of quantity take-off :Permit Volume IV <br />• Source of estimated swell factor :Operator Study