Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />• SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />HOURLY EQUIPMENT COST <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />071 State : Colorado Permit/job #: C-1981-018 <br />0112712009 County: Rio Blanco Abbreviation :none <br />JDM Site :Deserado Mine Filename :C018-071 <br />Permit or other job action : Renewal 5 <br />Task description :Replace Topsoil from Stockpile to East and West Haul Roads <br />Shift basis : 1 per day <br />uipment <br />• Cost Bre <br />?J <br />Scraper work team -Scraper : Cat 637G w/push-pull <br />-Push dozer INA <br />Support equipment -Load area :I NA <br />-Dump area :NA <br />NA <br />Road maintenance -Motor grader INA <br />-Water truck akdown : Scraper Work Team Support Equipment Road Maintenance Equipment <br /> Scraper Dozer Load area Dump area Grader Water truck <br />Import data filename : scraper2 NA NA NA NA NA <br />% Utilization-machine : 100 NA NA NA NA NA <br /> <br />-Ripper attachment : <br />NA <br />NA <br />NA <br />NA <br />NA -............. _..... _....----- <br />NA <br />Ownerhip cost/hour : $110.37 NA NA NA NA NA <br /> <br />Operating cost/hour : <br />$177.86 <br />NA <br />NA <br />NA <br />NA _ <br />_ <br />-NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $24.95 NA NA NA NA NA <br />Unit subtotals : $313.18 NA NA NA NA NA <br />Number of units : 6 0 0 0 0 0 <br />Group subtotals : Work : $1,879.06 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $1,879.06 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 70,800 CCY factor : 1.111 volume : 78,659 LCY <br />Source of quantity take-off : Divison Estimate <br />Source of estimated swell factor : CAT Handbook