Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />• SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />-.........---------..---- <br />Task # : 043 State :Colorado Permit/job # : C-1981-018 <br />Date : 0112712009 County: Rio Blanco Abbreviation :none <br />User: JDM Site :Deserado Mine Filename :C018-043 <br />Permit or other job action :Renewal 5 <br />Task description : Regrade Plant Access/Haul Road Area <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Scraper work team -Scraper : Cat 637G w/push pull <br />-Push dozer:NA <br />Support equipment -Load area : NA <br />-Dump area : NA ?W <br />Road maintenance -Motor grader : NA <br />-Water truck : NA <br />• Cost Bre <br />• <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 I NA NA NA NA NA <br />% Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $110.37 NA NA NA NA NA <br />Operating cost/hour : $177.86 NA NA NA NA NA <br />J <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $24.95 NA NA NA NA NA <br />Unit subtotals : $313.18 NA NA NA NA NA <br /> <br />Number of units : <br />6 <br />0 <br />0 <br />0 <br />0 _ <br />0 <br />Group subtotals : Work : $1,879.06 Support: $0.00 Maintenance : $0.00 <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume : 167.850 CCY factor <br />Source of quantity take-off :Permit Volume IV <br />Source of estimated swell factor :Operator Study <br />Total work team cost/hour : $1.879.06 <br />Loose <br />1.111 volume : 186,481 LCY