Laserfiche WebLink
sheet 1 of 2 <br /> CIRCES Cost Estimating Software <br />• TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task #: 042 State : Colorado Permit/job #: C-1981-018 <br /> <br />Date : 0112712009 _ <br />County: Rio Blanco Abbreviation :none <br />User : JDM Site: Deserado Mine Filename :C018-042 <br />Permit or other job action : Renewal 5 <br />Task description : Remove Parking Lot and Access Road Pavement <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />Truck/loader team -Truck l Cat 769D <br />-Loader : CAT 98OG (2001) <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />-Water fnick <br />C <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader NA NA NA NA <br />% Utilization-machine : 100 90 NA NA NA NA_ <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownership cost/hour : $54.06 $34.94 NA NA NA NA <br />._......... ...._....__........_.._ <br />Operating cost/hour : $70.69 $50.18 NA NA NA NA_ <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />u <br />Operator cost/hour : $21.72 $32:96 NA NA NA NA <br />Unit subtotals : $146.47 $118.09 NA NA NA NA_ <br />Number of units 1 0 0 0 0 <br />Group subtotals : Work : $411.02 Support: $0.00 Maintenance : $0.00 <br /> Total work team cost/hour : $411.02 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 3,671 LCY factor : NA volume : 3,671 LCY <br />Source of quantity take-off :Permit Volume IV <br />Source of estimated swell factor : NA <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Capacity : <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis : <br />Material weight : Z950 pounds/LCY Struck volume : 21.60 LCY <br />Descr.: Traprock - broken Heaped volume : 31.70 LCY <br />Rated payload : 82,000 pounds Average volume : 26.65 LCY <br />Payload capacity : 27.80 LCY Adjusted volume': 27.80 LCY <br />Final truck volume based on number of loader passes : 24.50 LCY <br />' truck volume adjusted to not exceed rated payload or heaped volume <br />Loadina Tool Capacity : Job Condition Corrections : Site altitude (ft.): -5,300 <br />Rated capacity (nom. heaped) : 7.000 LCY Truck Loader Source <br />• Descr.: Blasted rock - well blasted (80 - 95%) Altitude adj.: 1.000 1.000 (Cat HB) <br />Bucket fill factor : 0.875 Job efficiency : 0.830 0.830 (1 shift/day) <br />Adjusted bucket capacity : 6.125 LCY Net correction : 0.830 0.830