My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-18_PERMIT FILE - C1981018A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981018A
>
2009-06-18_PERMIT FILE - C1981018A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:55 PM
Creation date
8/13/2009 1:59:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018A
IBM Index Class Name
Permit File
Doc Date
6/18/2009
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Illustration 47
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 031 State : Colorado Permit/job# : C-1981-018 <br />Date : 0112712009 County: Rio Blanco Abbreviation : none <br />User: JDM Site : Deserado Mine Filename : C018-031 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Renewal 5 <br />Task description : Grade Uncompacted Refuse at Refuse Piles 21314 and 5a <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) <br />Blade type : Semi-Universal <br />Attachment no. 1 :BOPS Cab <br />Attachment no. 2 :3-shank ripper <br />Cost Breakdown : <br />• MATERIAL QUANTITIES <br />Initial <br />volume : 48,333 <br /> Utilization % <br />Ownership cost/hour : $71.49 NA <br />Operating cost/hour : $103.27 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $207.53 Total fleet cost/hour : <br /> <br />Swell Loose <br />LCY factor : NA volume : 48,333 <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors <br />Average push distance : 50 feet <br />Unadjusted hourly production : 2,110.5 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient : 0.00 % () <br />Average site altitude : 5,300 feet <br />Material weight : 2400 Ibs/LCY <br />Weight description : <br />USER-PROVIDED WEIGHT DATA <br />Horsepower: 405 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Source <br />0.75 (avg.) <br />1.20 (Cat HB <br /> <br />1.00 <br />1.00 ._..-----........._...----- <br />(gen.) <br />(avg.) <br />0.83 (lshift/day) <br />1.00 (doz-oc) <br />1.00 (Cat HB) <br />1.00 (Cat HB) _ <br />0.96 _(user) <br />1.00 (S/SU/U) <br />0.72 <br />Adjusted unit production : 1510.31 LCY/hr <br />Adjusted fleet production : 6,041.23 LCY/hr <br />JOB TIME AND COST <br />• Fleet size : 4 Dozer(s) Total job time : 8.00 Hours <br />Unit cost : $0.137 /LCY Total job cost : $6,642 <br />$830.14 <br />LCY <br />Operator skill :_ <br />Material consistency : <br />Dozing method : <br />Visibility: <br />Job efficiency : <br />Spoil pile : <br />Push gradient : <br />Altitude <br />Material weight : <br />Blade type <br />Net correction
The URL can be used to link to this page
Your browser does not support the video tag.