My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-18_PERMIT FILE - C1981018A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981018A
>
2009-06-18_PERMIT FILE - C1981018A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:55 PM
Creation date
8/13/2009 1:59:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018A
IBM Index Class Name
Permit File
Doc Date
6/18/2009
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Illustration 47
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />CIRCES Cost Estimating Software <br />COMPACTION WORK <br />PROJECT IDENTIFICATION <br />Task #: 029 State :Colorado Permit/job # : C-1981-018 <br />Date : 27-Jan-2009 County: Rio Blanco Abbreviation :none <br />User : JDM Site: Deserado Mine Filename :C018-029 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Renewal 5 <br />Task description : Compact Refuse at Piles 21314 and 5a and Facilities Area Refuse <br />HOURLY EQUIPMENT COST <br />Compactor type : Soil - tamping foot Shift basis : 1 per day <br />• <br />?J <br />Cost Breakdown : <br />MATERIAL QUANTITIES <br />Loose <br />volume : 380.000 <br />Machine description : CAT 815F Horsepower : 240 <br /> Utilization % Data source: <br />(CRG) <br />Ownership cost/hour : $37.70 -, <br />NA <br />Operating cost/hour : $62.88 100 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $133.36 Total fleet cost/hour : $133.36 <br />Shrinkage Compacted <br />LCY factor : 0.875 volume : 332,500 CCY <br />Source of estimated volume :Operator Estimate <br />Source of estimated shrinkage factor : Division Estimate <br />HOURLY PRODUCTION <br />Unadjusted hourly production = (W x S x L x C) / P <br />Compacted width per pass (W) : 6.42 feet <br />Average compactor speed (S) : 4.00 mph <br />Compacted thickness of each lift (L) : 24.00 inches <br />Conversion constant (C) : 16.3 (5,280 ft./12 in./27 cu.ft.) <br />Required number of machine passes (P) : 3 passes <br />Unadjusted hourly unit production : 3,348.67 CCY/hr <br />Job Condition Correction Factors <br />Site altitude : 5,300 feet <br />Source <br />Altitude adjustment factor : 1.00 (Cat HB) _ <br />Job efficiency factor : 0.83 (1 shift/day) <br />Net job correction : 0.83 multiplier <br />Adjusted hourly unit production : 2,779.40 CCY/hr <br />Adjusted hourly fleet production : 2,779.40 CCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 compactor(s) Total job time : 119.63 hours <br />Unit cost : $0.048 per CCY Total job cost : $15,953
The URL can be used to link to this page
Your browser does not support the video tag.