My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-18_PERMIT FILE - C1981018A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981018A
>
2009-06-18_PERMIT FILE - C1981018A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:55 PM
Creation date
8/13/2009 1:59:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018A
IBM Index Class Name
Permit File
Doc Date
6/18/2009
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Illustration 47
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />• TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name: Colorado Division Of Reclamation, Mining And Safety _ <br />Task #: 028 State : Colorado Permit/job #: C-1981-018 <br />Date : 0112712009 County :Rio Blanco Abbreviation :none <br />User : JDM Site : Deserado Mine Filename : C018-028 <br />Permit or other job action :Renewal5 <br />Task description: Haul Temporary Refuse from Facilities Area to RP-5a <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />(Equipment Description <br />Truck/loader team -Truck : Cat 769D <br />-Loader : CAT 98OG (2001) <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />-Water truck <br /> <br />Cost Breakdown : ruck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader NA NA NA NA <br />% Utilization-machine : 100 75 NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownership cost/hour : $54.06 $34.94 NA NA NA NA <br />Operating cost/hour : $70.69 $42.10 NA NA NA NA <br />NA <br /> <br />Ripper op. cost/hour : <br />NA <br />NA <br />NA <br />NA <br />NA _ <br />_ <br />Operator cost/hour : $21.72 $32.96 NA NA NA NA <br />Unit subtotals : $146.47 $110.01 NA NA NA NA <br />Number of units : 4 1 0 0 0 _ <br />0 <br />Group subtotals : Work : $695.88 Support: $0.00 Maintenance : $0.00 <br />MATERIAL QUANTITIES <br />Initial <br />volume : 48,333 LCY <br />Total work team cost/hour : $695.88 <br />Swell Loose <br />factor : NA volume : 48,333 LCY <br />Source of quantity take-off :Permit Volume IV <br />Source of estimated swell factor :NA <br />Material purchase cost : $0.00 /LCY <br />HOURLY PRODUCTION <br />Truck Capacity : <br />Truck Pavload /weiahtl Basis : Truck 13ed h <br />Total cost : <br />Basis : <br />Rn <br />Material weight : 2,400 pounds/LCY Struck volume : 21.60 LCY <br />Descr.: USER-PROVIDED WEIGHT DATA Heaped volume : 31.70 LCY <br />Rated payload : 82,000 pounds Average volume : 26.65 LCY <br />Payload capacity: 34.17 LCY Adjusted volume": 31.70 LCY <br /> Final truck volume based on number of loader passes : 30.62 LCY <br /> 'truck volume adjusted to not exceed rated payload or heaped volume <br />Loading Tool Capacity : Job Condition Corrections : Site altitude (ft.) : 5,300 <br />Rated capacity (nom. heaped) : 7.000 LCY Truck Loader Source <br />• Descr.:Loose material - 1"and over (85 - 90%) Altitude adj.: 1.000 1.000 (Cat HB) <br /> <br />Bucket fill factor : <br />0.875 <br />Job efficiency : 0.830 <br />0.830 _ <br />(1 shift/day) <br />Adjusted bucket capacity : 6.125 LCY Net correction : 0.830 0.830
The URL can be used to link to this page
Your browser does not support the video tag.