Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task #: <br />Date : <br />User : <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />027 State :Colorado Permit/job # :C-1981-018 <br />0112712009 County: Rio Blanco Abbreviation :none <br />JDM Site: Deserado Mine Filename :C018-027 <br />Permit or other job action :Renewal 5 <br />Task description :Cover RP-5a with Subsoil <br />HOURLY EQUIPMENT COST <br />uipment Description <br />• Cost Br( <br />Shift basis : 1 per day <br />Scraper work team -Scraper:ICat 637G w/push-pull <br />-Push dozer :INA <br />Support equipment -Load area :INA <br />-Dump area :NA <br />Road maintenance -Motor grader :NA <br />-Water truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader water truck <br />Import data filename : scraper2 NA NA NA NA NA <br />% Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA ?NA <br />Ownerhip cost/hour : $110.37 NA NA NA NA NA <br />Operating cost/hour : $177.86 NA NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $24.95 NA NA NA NA NA <br />Unit subtotals : $313.18 NA NA NA NA NA <br />Number of units : 6 0 0 0 0 0 <br />Group subtotais : Work : $1,879.06 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $1,879.06 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 102,667 CCY factor : 1.111 volume : 114,063 LCY <br />Source of quantity take-off :Permit Volume !V <br />• Source of estimated swell factor :Operator Study