My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-18_PERMIT FILE - C1981018A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981018A
>
2009-06-18_PERMIT FILE - C1981018A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:55 PM
Creation date
8/13/2009 1:59:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018A
IBM Index Class Name
Permit File
Doc Date
6/18/2009
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Illustration 47
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br /> BULLDOZER WORK <br /> <br /> PROJECT IDENTIFICATION <br /> Task #: 012 State : Colorado Permit/job# : C-1981-018 <br /> Date : 0112612009 County : Rio Blanco Abbreviation :none <br /> User : JDM Site : Deserado Mine Filename : C018-012 <br /> Agency or organization name : Colorado Division Of Reclamation, Mining And Safety _ <br /> Permit or other job action :Renewal 5 <br /> Task description : Regrade Rock Dust Bin Facility Area <br /> HOURLY EQUIPMENT COST <br /> Basic machine : Cat D9R - 9SU (2005) Horsepower: - 405---- <br /> Blade type : Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization % v? <br /> Cost Breakdown : Ownership cost/hour : $71.49 NA <br /> Operating cost/hour : $103.27 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $207.53 Total fleet cost/hour: - $830.14 <br /> <br />• MATERIAL QUANTITIES <br /> Initial Swell Loose <br /> volume : 1,460 CCY factor : 1.111 volume : 1,622 LCY <br /> Source of estimated volume: Permit Volume IV <br /> Source of estimated swell factor :Operator Study <br /> HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br /> Average push distance : 100 feet Material consistency : 0.95 (user) <br /> Unadjusted hourly production : 1,243.2 LCY/hr Dozing method : 1.00 _ (gen.) <br /> Visibility: 1.00 (avg.) <br /> <br />Material consistency description : <br />Job efficiency : <br />0.83 _ <br />_ <br />(1shift1day) <br /> User provided factor Spoil pile : 0.93 (user) <br /> Push gradient : 1.00 (Cat H_B) _ <br /> Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br /> <br />Average site altitude : <br />5,300 feet Material weight : - <br />0.84 ------.-...--- <br />(user) <br /> Blade type : 1.00 (S/SU/U) <br /> Material weight : 2,743 Ibs/LCY Net correction : 0.46 <br /> Weight description : <br /> USER-PROVIDED WEIGHT DATA Adjusted unit production : 573.10 LCY/hr <br /> Adjusted fleet production : 2,292.41 LCY/hr <br /> <br />• JOB TIME AND COST <br />Fleet size : <br />4 Dozer(s) Total job time : <br />0.71 Hours <br /> Unit cost : $0.362 /LCY Total job cost : $587
The URL can be used to link to this page
Your browser does not support the video tag.