My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-18_PERMIT FILE - C1981018A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981018A
>
2009-06-18_PERMIT FILE - C1981018A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:55 PM
Creation date
8/13/2009 1:59:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018A
IBM Index Class Name
Permit File
Doc Date
6/18/2009
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Illustration 47
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />• <br />• <br />• <br />User <br />Date : 06-Feb-2009 Permit or job no.: C-1981-018 Site :Deserado Mine <br />JDM Abbreviation : none <br />Filename : C018-000 <br />Agency or organization name : Colorado Division Of Reclamation, Mir <br />Permit or job action :Permit Renewal 5 <br />_ State :Colorado <br />_ County : Rio Blanco <br />And Safety <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />OOA -Backfrlling and rough Grading Tasks - Tasks 001-014 misc-eqp 8 499.9 $507,324 <br />OOB -Waste Pile Compacting and Covering Tasks - Tasks 025-031 misc-eqp 8 466.3 $515,058 <br />OOC -Ripping Tasks - Tasks 035-038 misc-eqp 5 9.2 __ <br />$6,665 <br />OOD -Road Reclamation Tasks - Tasks 042-048 misc-eqp 8 138.0 $ <br />2 <br />4 <br />,3 <br />6 <br />0 <br />3 <br />OOE -Finish Grading Task - Task 055 <br />g <br />grader <br />1 <br />13.8 _ <br />_ <br />_ <br />. <br />__ <br />. <br />$1,608 <br />OOF -Drainage System Removal Tasks - Tasks 060-065 misc-eqp 1 34.7 $8,028 <br />OOG -Topsoil Replacement Tasks - Tasks 070-089 misc-eqp 8 263.0 _ <br />$464,471 <br />OOH_ -Portal and Borehole Sealing Tasks - Tasks 094-095 misc-eqp 1 562.0 $178, <br />703 <br />0001 -Structural Demolition Tasks - Task 097 demolish 1 960.0 _ <br />$2, 078, 991 <br />OOJ -Revegetation Tasks - Tasks 100-108 revege 1 688.7 $253,101 <br />OOK -Miscellaneous Reclamation Tasks - Tasks 114-116 misc-eqp 3 1,217.01 $195,139 <br />OOL -Equipment Mobilization/Demobilization Tasks - Tasks 120-122 mobilize 1 26.0 _ <br />$53,393 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 4,878.9 $4,466,817 <br />includes inflation factor adjustment of : NA % TOTAL DIRECT COST ` $4,466,817 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liability insurance : 2.02 % of direct total = $90,23 <br />0 <br />Performance bond : 1.05 % of direct total = _ <br />$4 <br />6,902 <br />Job superintendent : 2439.49 hrs*...$1hr. $41.25 total = _ <br />$10 <br />0, <br />629 <br />Profit : 10.00 % of direct total = _ <br />_ <br />$446,682 <br />. assume net hours = 50% of task hours TOTAL O & P = $684,442 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - CONTRACT AMOUNT (direct + O & P) =Y $5,151,259 <br />Financial warranty processing (legal/related costs) : NA NA NA total = $0 <br />Engineering work and/or contract/bid preparation : 4.25 % of cntr. NA total $218,929 <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $257,563 <br />CONTINGENCY- NA* NA total = NA <br />contingencies accounted for at task level <br />TOTAL INDIRECT COST = <br />TOTAL BOND AMOUNT (direct + indirect) _ <br />$1,160,934_ <br />$5,627,751
The URL can be used to link to this page
Your browser does not support the video tag.