Laserfiche WebLink
Reverse sequence soil handling will be practiced on the refuse areas to reduce the cheatgrass dominance <br />unless a field trial result demonstrates that an alternative approach is more appropriate. Additional studies <br />to identify the factors controlling the site-specific dominance of cheatgrass will be undertaken. The first <br />phase of the studies will include the collection and analysis of soils from sites with and without cheatgrass <br />problems. The second phase will include actual test plots. As presently envisioned, these plots will include <br />treatment of 1) subsoil over topsoil and 2) `internal' topsoil over subsoil. Plots will be constructed during the <br />next available cycle of refuse pit reclamation currently anticipated for the fall of 2012. Other treatments not <br />requiring soil placement may be tested prior to the next cycle of refuse pit reclamation. The first phase <br />involving soil testing will be initiated a minimum of one year prior to test plot construction on the refuse pits. <br />Should direct handling of soils occur it would be appropriate to place topsoil on the surface in a customary <br />manner provided the topsoil's origin is from an area which supports little or no cheatgrass. Prior to <br />stripping, such areas would be delineated in the field for such designated use. Within the refuse area the <br />soils with the deepest topsoils tend to have the most cheatgrass. Thus, it is anticipated that customary <br />sequencing of soil placement will be limited. In cases where soils are stockpiled the quantity of cheatgrass <br />susceptible and non-susceptible topsoils will be evaluated. If the quantity is sufFcient to warrant separate <br />handling and additional disturbance for the stockpile they will be stored separately. Otherwise, these <br />topsoils will not receive special handling. <br />The thickness of the topsoil/subsoil layers will not be affected due to the reversing of the placement <br />sequence. <br />V.I. Revegetation <br />• The following sections (V.I and V.J) describe procedures to be followed for revegetation. The revegetation <br />plan will be reviewed on an annual basis to fine-tune the revegetation plan to optimize its performance. <br />V.1.1 Introduction The objective of the revegetation program is to return the land disturbed by mining <br />activities to an equivalent or higher functional value for its assigned postmining land use. The postmining <br />land use in this case will be livestock grazing and wildlife habitat. <br />Interim and permanent revegetation of the following mine facility categories covered in this section include: <br />a. roadways and other types of vehicle access <br />b. operations support facilities <br />c. mine waste disposal areas <br />d. conveyor corridor facilities <br />e. temporary use and laydown areas <br />The reclamation plan accounts for the replacement of topsoil or other growth media and revegetation of all <br />areas disturbed by the above types of facilities, excepting the areas listed below: <br />a. Rock cuts having slopes steeper than 1.3:1 <br />b. Open water and water courses <br />c. Roadways and other access areas intended for use in the postmining period <br />• <br />Technical Revision #65 (4/2008) V-29 <br />