Laserfiche WebLink
Environmental Protection Plan, Schwartzwalder Mine 15-1 <br />• 15. CONSTRUCTION SCHEDULE INFORMATION <br />The Rules require that the EPP provide a detailed construction schedule for (1) all facilities designed to <br />contain or transport toxic materials, acid-forming materials, or designated chemicals used in the extractive <br />metallurgical process and (2) all facilities proposed to contain, hold, or for disposal of material that has the <br />potential to cause acid mine drainage. The Schwartzwalder Mine has been reclaimed, and no facilities are <br />planned for construction. <br />• <br />• <br />4109C.090807 Whetstone Associates 6