Laserfiche WebLink
<br />• <br />• <br />Environmental Protection Plan, Schwartzwalder Mine <br />11-18 <br />Ralston Creek Below Property Line (SW-BPL) <br />Note: Log Scale <br />1 <br />0.1 <br />EE <br />c <br />0 <br />F <br />@ <br />S 0.01 <br />c <br />0 <br />U <br />E <br />'c <br />7 <br />0.001 <br />0.0001 - - - <br />Jan-89 Jan-91 Jan-93 Jan-95 Jan-97 Jan-99 Jan-01 Jan-03 Jan-05 Jan-07 Jan-09 <br />Ralston Creek at First Bridge (SW-FBRG) <br />Note: Log Scale <br />1 <br />0.1 <br />w <br />E <br />c <br />0 <br />a <br />@ <br />0.01 <br />c <br />0 <br />U <br />E <br />'c <br />@ <br />0.001 <br />0.0001 - - - <br />Jan-89 Jan-91 Jan-93 Jan-95 Jan-97 Jan-99 Jan-01 Jan-03 Jan-05 Jan-07 Jan-09 <br />Figure 11-8. Uranium Concentrations in Ralston Creek at Downstream Stations SW-BPL <br />and SW-FBRG, 1990 - Jan 2009 <br />4109C.090807