Laserfiche WebLink
Environmental Protection Plan, Schwartzwalder Mine 11-7 <br />• <br />• <br />• <br />Historical surface water monitoring was conducted at the designated point of compliance in Ralston Creek <br />(Station SW-BPL), and at five other stations for the purpose of understanding upstream sources, further <br />characterizing the creek, and evaluating the potential effects of an ore truck spill on the creek (Station SW- <br />ARH). Two of the historical monitoring stations are located above the point of compliance: Station SW- <br />AWD (located above the waste rock dumps) and Station SW-A001 (located above the former water <br />treatment plant discharge). Three of the stations are located downstream of the point of compliance: SW- <br />ARH (above Red Hill), SW-FBRG (at the first bridge), and SW-LLHG (on Ralston Creek at the Long Lake <br />Head Gate, approximately 1.5 miles downstream from the Schwartzwalder Mine). <br />The period of record extends from approximately 1973 to the present". The data set contains dissolved and <br />total uranium and radium, as well as field parameters (temperature, pH, conductivity, and dissolved <br />oxygen.) A longer suite of parameters was analyzed approximately annually at each station. <br />In addition to the routine historical monitoring described above, an intensive water quality study was <br />conducted from 1998-1999 as part of the mine closure hydrology evaluation conducted by Cotter <br />Corporation and Adrian Brown Consultants. Water quality in Ralston Creek was measured approximately <br />monthly at 10 stations, which are listed in order from downstream to upstream in Table 11-5. The <br />analytical suite included constituents for which drinking water Maximum Contaminant Levels (MCLs) and <br />Colorado instream water quality standards existed at the time. <br />Table 11-4. Historical Monitoring Stations and Non-Routine Sampling Stations in Ralston <br />Creek <br />STATION NORTHING EASTING ELEVATION DESCRIPTION FREQUENCY <br />NAME <br />SW-LLHG <br />........................ ..................................................... 726,873.63 <br />....._. ................... 2,065,661.22 <br />...................... ....... ................. ........ ................ : 6358.0 <br />..................... <br />_............._.. <br />.... <br />......... <br />.... <br />... <br />.. <br />. Lon Lake Head Gate <br />_ <br />. <br />. <br />. <br />. <br />. <br />. <br />. Monthly <br /> <br />SW-ARH <br />729,590.23 <br />2,064,210.64 . <br />. <br />. <br />.. <br />... <br />. <br />.... <br />6358.0 . <br />.. <br />.. <br />... <br />....... <br />. <br />.......... <br />... <br />......................................................................................... <br />Above Red Hill ...._...................... .......................................................... <br />Variable <br />SW-FBRG <br />.......... ................................................................... 731,700.86 <br />..... ...................................... .............. ................ 2,063,819.07 <br />.......................................................... ........... 6460.0 <br />..................................... ...................................... First Bridge <br /> <br />...................................... <br />. ................... ......... ........................................................ Variable <br /> <br />....:. <br />SW-BPL <br />.......... ........................................... ..................... 732,105.23 <br />............................. ......... ........... ............................ 2,063,068.76 <br />_................................... .............................. .... : 6509.0 <br />...................... ..............._..................................... Below ProPerty Line <br />.,............. ... Monthly <br />SW-DIS001 <br />.......... 733,406.0 2,061,299.0 6585.0 ' Discharge Month <br />SW-A001 <br />.......... ................................................................... 733,650.46 <br />..... ................................................... <br />... <br />... <br />.... <br />.... 2,061,153.05 6590.57 Above Discharge Pt A001 Monthl <br />Y <br />SW-AWD <br />.......... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. <br />. <br />... <br />. <br />734,870.0 <br />. . . . . _ . ..................................................................... <br />2,059,850.0 <br />............... .................................... ......................................... <br />6639.9 <br />........................................................................... . ...................... .................................................. ................. .................................... <br />Above Waste Dum <br />._.............................................................................................................................. .... . <br />Variable <br />..................................................................................... <br />SW-Abv PI <br />............................ Above Plant Site Variable <br />D-MENA <br />............................................................................. 735,830.0 <br />...................................................................... .: 2,056,360.0 : 6790.0 Downstream of Mena Variable <br />SHFTMENA <br />....... ..... ..... ..............._............... ...................... _.... 735,960.0 <br />..... ....................................................... _.............. 2,055,850.0 <br />.............................. ........... .......................... : 6835.0 <br /> <br />: <br />........................................................................... Mena Shaft <br /> <br /> <br />. <br />..................................................................................................................... <br />............ Variable <br /> <br /> <br />.... <br />_ <br />... <br />..... <br />. <br />.. <br />. <br />.. <br />. <br />. <br /> <br /> <br />U-MENA <br /> <br />735,940.0 <br /> <br />2,055,380.0 <br /> <br />6815.0 , <br />. <br />Upstream of Mena : <br />. <br />... <br />.. <br />....... <br />............. <br />.... <br />. <br />. <br />. <br />............................. <br />Variable <br />Note: Coordinates in NAD 27. Stations listed in order from downstream to upstream <br />17 The surface water quality data evaluated for this report ranges from 1998 (or 1990 for uranium) to January 2009. <br />4109C.090807 Whetstone Associates