Laserfiche WebLink
Appendix B <br />PROTECTION OF THE HYDROLOGIC BALANCE <br />BOWIE NO.2 MINE <br />COAL MINE WASTE DISPOSAL SITE <br />Notes for Calculations: <br />1. Pages 2-8 present a spread sheet calculation of the required capacity of the <br />sediment pond based on the 10 year event. <br />2. Design points are shown on Figure 2. <br />3. Ditches were sized using SEDCAD4. Ditches were sized using the 100 year event. <br />Page 40 shows the peak flow used to size the emergency and embankment spillways <br />using the 25-year event in the SEDCAD4 program. <br />ENGINEER'S CERTIFICATION <br />The calculations and information <br />• prepared under my direct ?uq? <br />information presented is to <br /> <br />nted on pages 2-40 with a date of 04/09 were <br />uring the month of April 2009, and the <br />the best of my knowledge and belief. <br />?o <br />James E° tgver, P. <br />Registered Prd?ana <br />State of Colorazl <br />• <br />Date <br />30 <br />r <br />TR-61 04/09 <br />PP/Ro v r b <br />6/1'1104