My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-08-12_REVISION - C1981012
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2009-08-12_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:49:43 PM
Creation date
8/12/2009 1:13:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
REVISION
Doc Date
8/12/2009
Doc Name
Letter Application and Public Notice
From
Peak Project Management, LLC
To
DRMS
Type & Sequence
TR51
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />'X876; a <br />APPLICATION FORM FOR A REVISION ' v'? <br />??ision a n 0 6y5&tety <br />TO A COAL MINING AND RECLAMATION PERM <br />Alin?ng <br />This form must be completed and submitted with all requests for minor revisions, as defined in Rule 1.04(73), <br />technical revisions, as defined in Rule 1.04(136), and permit revisions, as defined in Rule 1.04(90). All revisions <br />are to address the requirements of Rule 2.08.4. Three (3) copies of the revision, including maps, must be <br />submitted in order for it to be complete. <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised sections, maps, <br />tables and/or figures, with a revised table of contents, if necessary. The revision submittal date should be printed <br />in the lower right comer of each revision page. A cover letter to the revision should explain the nature of the <br />revision and reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal mailing list <br />(except OSM) at the same time the application is submitted to the Division, and proof of distribution must be <br />submitted to the Division along with the application. Copies of revision pages modified during the review process <br />must be distributed in the same manner, along with proof of distribution. Proof of distribution must be submitted <br />prior to implementation of the revision. <br />Permit No.: C - 81 - 012 Date: O l? l 00 <br />permittee⢠New Elk Coal Company <br />New Elk Mine <br />street 34115 County Road 20.8 <br />City: <br />Trinidad <br />State: Co Zip Code: 81082 - <br />Brief Description of Revision: 3;?coc a sC? Su ria? oY (A r ?a ocQ ct.v\-? <br />Public Notice Attached: Yes ?No - (Required for PRs and TRs) <br />Bond Increase: Yes L-"No Federal Non-Federal Mine <br />Proposed Change in: <br />Permit Area - <br />Disturbed .5 Acres <br />Permit b Acres <br />Affected Acres <br />Mineral Ownership - <br />Mineral Private (+/-) - - 0 Acres <br />Mineral Federal (+/-) - - 0 . D Acres <br />Surface Ownership - <br />Private Land _5' Acres <br />Federal Land 0 Acres <br />State Land (+/-) - - - 0 Acres <br />Mineral State (+/-) - - .0 . L Acres
The URL can be used to link to this page
Your browser does not support the video tag.