Laserfiche WebLink
energy fuels coal, inc. <br />southfield mine • post office box 459 • Florence, colorado 81226 • (719) 784-6395 <br />AUG.12O <br />-ec(amation, <br />Mining and Safety <br />August 10, 2009 <br />Ms Janet Binns - Reclamation Specialist <br />Colorado Division of Reclamation Mining & Safety <br />1313 Sherman St. - Room 215 <br />Denver, CO 80203 <br />RE: Kerr Coal Company (Permit No. C-80-006) <br />Technical Revision No. 24 (TR-24) <br />Extension Request <br />Dear Janet Binns: <br />This letter is further response to your adequacy concerns letter dated June 10, <br />2009 with reference to the revision request, TR-24. Kerr respectfully requests the <br />Division to extend the response time for TR-24 to September 15, 2009 to allow time for <br />additional research. The land owner of the Loadout site has stated that he has some water <br />rights with the property adjacent to the Kerr Tipple Pond and wants to check if they could <br />be applied to augment the Tipple Pond. However, he is currently busy in his harvest <br />season in the valley and has been unable to look into the detail of those water rights at <br />this time. I hope this extension request does not impose an inconvenience for the <br />Division. <br />If you have any questions or require additional information, please contact me. <br />Sincerely, <br />f <br />eo e V Pa erson <br />en Mine Manager <br />1