Laserfiche WebLink
-4- <br />12. Prima future (Post-mining) land use check one : <br />Cropland(CR) _0 Pastureland(PL) -E]General Agri culture(GA) <br />Rangeland(RL) -E]Forestry(FR) Wildlife Habitat(WL) <br />Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br />Developed Water Resources(WR) Solid Waste Disposal(WD) <br />13. Primary Dresent land use (check one): <br />El Cropland(CR) Pastureland(PL) General Agriculture(GA) <br />II Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br />Residential(RS) _E1 Recreation(RC) Industrial/Commercial(IC) <br />Developed Water Resources(WR) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Dozer and front end loaders remove material and take to plant. <br />15. On Site Processing: Fy-1 Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />Material is process into roadbase material for use on county roads using crushers and screen plant. <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: <br />None <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s).