Laserfiche WebLink
FORBS: <br />Coreopsis, Lance <br />Daisy, Engiemann <br />Golden Banner <br />Leafed Coreopsis lanceolata 1.00 Native NA 25.6 <br />Is Englemannia pinnatifida 1.00 Native NA 4.9 <br /> Thermopsis montanus 1.00 Native NA 0.7 <br /> <br /> <br /> <br /> <br /> <br /> <br />0001 IRC AAIn TRFFC /--A <br />sheet 2 of 2 <br />-$49.35- <br />-$197.-40. <br />$79.25 <br />' TOTAL SEEDS / SO. FT.: 235.5 ' TOTAL POUNDS PLS I ACRE : 21.00 'TOTAL SEED MIX c:US I 1 A%.KC : 000.5 70 <br />Seed application - method : Drill seeding (DMG survey data) TOTAL SEED APPLICATION COST I ACRE : $74.78 <br /> <br />MULCHING and MISCELLANEOUS DESCRIPTION (data source) UNITS / ACRE UNIT COST! UNIT COST I ACRE <br />Materials item no. 1 : Straw, delivered (DMG survey data) 2.00 ton $99.62 $199.24 <br />item no. 2 <br />item no. 3: <br />item no. 4: <br /> TOTAL MULCH MATERIALS COST / ACRE : $199.24 <br />Application - method no. 1 : Power mulcher (MEANS 02910 500 0350) $61.86 <br />method no. 2 <br />method no. 3: <br />TOTAL MULCH APPLICATION COST I ACRE : $61.86 <br />NURSERY STOCK PLANTIN G TYPE and SIZE MATERIAL PLANTING COST / FERT. TOTAL TOTAL <br />COMMON NAME NO. I ACRE (planting cost data source) COST ! PLANT COST / PLANT PELLET COST / PLANT COST/ACRE- <br />No nursery stock required <br /> <br /> <br /> <br /> <br /> <br /> <br />JOB COST No. of acres <br />Estimated failure rate (percent) <br />' Selected replanting work items <br />0.29 <br />50.00% <br />S <br />TOTAL NUK5E11T S 1 UWk 6U01 I A%.KC : v V. V V <br />Cost / acre : $999.45 INITIAL JOB COST : $289.84 <br />Cost / acre': $738.36 RESEEDING JOB COST : $107.06 <br />TOTAL JOB COST : $397 <br />