Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task # : 332 <br />Date : 0512612009 <br />User : JRS <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State :Colorado Permit/job# : C-1996-083 <br />County :Delta Abbreviation :none <br />Site :Bowie No. 2 Mine Filename :C083-332 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Minor Revision 105 <br />Task description : Regrade Drill Pad <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2:3-shank ripper <br />Horsepower: 405 <br />Shift basis : 1 per day <br /> Data source : (CRG <br />) <br /> _ <br />Utilization % <br />Cost Breakdown : Ownership cost/hour : $71.49 NA <br />Operating cost/hour : $103.27 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $207.53 Total fleet cost/hour : $207.53 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,600 BCY factor : 1.250 volume : 3,250 LCY <br />Source of estimated volume : Division Estimate <br />Source of estimated swell factor : CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 125 feet Material consistency : 0.90 (Cat HB <br />) <br />Unadjusted hourly production : 1,055.6 LCY/hr Dozing method : 1.00 _ <br />(gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 ( <br />1shift1day <br />) <br />Compacted fill or embankment Spoil pile : 0.80 _ <br />_ <br />(fnd-rt) <br /> Push gradient : 0.90 (Cat HB) <br />Average push gradient : 5.00 % (pos) Altitude : 1.00 (Cat HB <br />) <br />Average site altitude : 6,500 feet Material weight : 0.79 _ <br />(Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.32 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 338.92 LCY/hr <br /> Adjusted fleet production : 338.92 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 9.58 Hours <br />Unit cost : $0.612 /LCY Total job cost : $1,990