Laserfiche WebLink
FROM : <br />13ASTN RESOURCES, INC. <br />2. Address <br />34115 COUNTY ROAD 20.8 <br />3. City 4. State <br />Trinidad CO <br />5, zip Code 6. Phone Nurrtber <br />81082 (719) 846-242' <br />7. OpemtorName, if Different than Purmittee, <br />8. Mira; Name <br />GOLDEN EAGLE MINE <br />U. S. -DEPT. OF THE INTERIOR. <br />° OFFICE OF SURFACE MlNiNG <br />y Mine Site Evaluation <br />State Program <br />1. PermitteeTorson <br />25. Hours <br />8.0 <br />O.U <br />a.o <br />2.0 <br />have not beau". <br />AP.. Active Coal*Producing: Coal surface mining P1...Phase I Release; At least Phase I bond release reclamation completed. <br />activities are occurring. granted for entire permitted area For Interim FO„Abandoned Site• Abandoned site that <br />AN.. Active Non-Producing: Active non-produeika permits, parttal bond release. is permitted but there is no bond. <br />facility such as tipple or. preparation ,plant. P2.. Phase Il Release; At least Phase Il bond releaseWC.yvildcat: Coal mining and reclamation <br />NM-No Mining; The Permit Status is active, site is forthe entire permitted area. operations have or are taking place and <br />not In Temaorarv Cessation, no surface coal P3.. Phase Ill Release., Reclamation completed and the activity is not cvve?ed the <br />FAX NO. : 17198464975 Feb. 15 2007 04:51PM P3 <br />26, Signature Block <br />9. Permit Number 10, Permit'lype <br /> <br /> C-013-81 pP <br />11, Field Visit Date 12. Purpose 13. SPA Present <br /> UZ/06/2007 CC N? <br />mm-dd .YYYY <br />14. P=ait Status 15. Site Status 16.. Facility'IypType <br />.IN T2 l ?.J <br />17. OSM Office # AS. CCID # 19. Land Code <br />1ao GC07-yap-oo1 STS <br />20. M.S.I1A ID # 21. State Abrev. 22. County Mms <br /> C-02$38 <br />71 <br />El <br />LAS AN 1 <br />23 . AVS Permittee Entity TD Number 24. State Office <br />O5G887 <br />a. Permit Review IJrA <br />Sim t e: a/??c7 <br />b. Site Visit Time H(ENR'Y AUSTIN ID # 116 <br />c. Travel Time Printed Name; <br />d. Report Writing Date; - 0210612007 <br />27. Reviewitn Official: <br />Signature: <br />Review Date: 2 / G / 2dd"7 <br />mm - dd - yyyy <br />Is Supplemental MSE Page Used YIN FY <br />Permit Type Item 10 IP - Inle im Program, PP = Permanent Program, NP = No Permit <br />Purpose Type Codes Item 12 CCR... Citizen Complaint Referral (non site visit) <br />OM ,,,Oversight WL... Reclamation Fees CC....., Citizen Complaint (initial site visit) <br />Axc... Assistance Fxx..... Federal Actions cCF.... Citizen Complaint Follow-up - <br />Joint inspection -- Item 13 A joint inspection is when a state inspector accompanies an OSM inspector anytime during the review of the mine site. <br />Permit Status- Item 14 - AS.... Abandoned: All surface and underground coal mining activities have ceased and <br />operator has left the site without completing reclamation as defined in <br />A.... Active: Coal mining and reclamation activittes occurring or 30 CFR 840.11(9) <br />ppermitted but not yet disturbed. A61..Bond Forfeiture: Bond forfeiture officially in process or completed, and. <br />IN .... inactive (Permanent Program Permit): Phase li completed or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations. (interim Program Penmt) A132„partially Reclaimed Forfeiture: Forfeited sits where all bonds have been <br />Coal mining completed and reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />RR...Bond Release; Reclamation completed and State Regulatory AS3..Reclalmed Forfeiture: Forfeited site that has been reclaimed to Program standards <br />Authority (RA) has released all of the bond (Phase!!! Release.) NA...N_ot Applicable: When site is unpermitted. <br />Site Status Codes-- item 15 NS.. Non-Site Visit: Status of site not determined <br />'ND.. No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP.. Forfeiture Pending: The RA Is pursuing <br />operations have been started. site regraded and awaiting phase bond release, actions to revoke he permit, collect the <br />EX.. Coal F.ploration- Coal exploration operations TC..'remporary Cessation: The RA has granted _ pperformanca bond(s), andlor reclama- <br />have started and where coal mining operations cessation of mining pursuant to 30 GFR 8161 lion of forfeited site is in progress. <br />81713110 FR.. Forfeited and Reclaimed; Forfeiture <br />Facility Typo Codos - item 16 D...Anciliary (Hauiroad, Conveyor. and/or Rails) H ..Exploration Permits ^~ L... Rerninine site permitted <br />A... Surface E...Refuse and/or Impoundment L.. Noticeof intentto Ekpiore under3 CFR785.25 <br />B... Underground F... Loading Facility and/or Tipple J... Exempt 16 and = <br />• C... Preparation Plant G.-Stockpiles K..Govemment Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SSREFA) <br />Your Comments Are Important <br />Trio Small Pouincss and Agriculture RogulMory Enforcement Ornbudsm?n and 10 Regional Pairrless Boards were estaNichccl to receive commenl5 from <br />smail buss imsm about TCdaral agency onforocment actions. The Ombudsman will annually evsluate the enforeement activities and ngoe tach a2i ncv's <br />Tf unti nrF A STAB hii-4nam (a hiatinwRit With 500 or fewer CmtSIoVCes including. those Ala iliateS) t p.,tiP 1 p