Laserfiche WebLink
• <br />10.. <br />11 <br />Cite ca[Culation shows the interest due is '.257.697.00 as of Nlay 16, .2007. <br />Interest accrues at the rate of $137.00 a day. <br />ec ama ion oar to increase the <br />proposed bond by the amount of pre and post judgment interest awarded added to <br />the $622,000.00 at the statutory interest of 8% compounded annually due from <br />March 21, 2002 through May 16, 2007, and/or up until Basin Resources, Inc. is <br />required by the State of Colorado to post the additional bond. Plaintiffs request <br />that the bond to be posted is to be no less than $879,697.00. <br />The damaie award of $622,000.00, pre and post jndguient interest from the :date, <br />Plaintiffs filed suit, March 22, 2002 until the date: paid is a final:judgirient even;.; <br />through the Colorado Supreme Court: <br />Plaintiffs are requesting the Mine Land R 1 t' B OarU to increase me <br />Respectfully submitted this:6th day of April, 2007. <br />Original signature of Jim Tatum on file <br />at the Law Office of Jim Tatum <br />s/Jim Tatum <br />............... <br />Jim Tatum, A.R. # 17204 <br />U129 N. Commercial Street <br />Trinidad, CO 81082 <br />Phone: (719) 846-0149 <br />Fax: (719) 846-0159 <br />E-mail: jtatum@adelphia.net <br />In accordance with C. R. C P 121 § 1-26(9), a printed copy of this document with <br />original signatures is maintained by the filing parties at the Law Office of Jim Tatum and <br />will be made available for inspection by other parties or the Court upon request. <br />1 <br />i