My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-05-10_ENFORCEMENT - C1981013
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1981013
>
2007-05-10_ENFORCEMENT - C1981013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:16:52 PM
Creation date
8/7/2009 3:58:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Enforcement
Doc Date
5/10/2007
Doc Name
DRMS Brief in Support of NOV CV2007001, Civil Penalty & Proposed Decision on SI
Violation No.
CV2007001
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
United States Department of the Interior <br />IN REPLY RURR TO! <br />OFFICE OF SURFACE MINING <br />Reclamation and Enforcement <br />P.U. Box 46667 <br />Denver. Colorado 80201-6667 <br />I <br />February 27, 2007 fQ? <br />MAR p 7 Z <br />Mr. Dave BY ???%s,r,•;? or <br />Office of Mined Land Reclamation mini q `'n,j sale y?OR <br />Acting Director, . <br />Division of Reclamation, Mining and Safety <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Dear Dave: <br />i <br />This is the Office of Surface Mining's (OSM) determination with regard to your response to ten- <br />day notice No. X-07-140-i 16-001. We issued the ten-day notice because of a possible violation <br />by Basin Resources, Inc. at its Golden Eagle mine under permit number C-013-81. The possible <br />violation involved Colorado rule 4.20.3 (2) which requires repair of structures damaged by <br />subsidence or compensation to the owner in the full amount of the diminution in value resulting <br />from subsidence. By lettei dated February 15, 2007, you informed OSM that you issued a notice <br />of violation (NOV) to Basin Resources, Inc., for failure to compensate the owner of the structure <br />damaged by subsidence. You incorporated the Colorado Court of Appeals' determination of the <br />amount of compensation required. Your NOV set May 15, 2007, as the time for abatement. <br />Our review and determination of your response is covered under 30 CFR 842.11(b)(2). An action <br />or response by a State regulatory authority that is not arbitrary, capricious, or an abuse of <br />discretion under the State program shall be considered "appropriate action" to cause a violation to <br />be corrected or ",good cause" for failure to do so. These terms are defined in (b)(2) and (3) as <br />follows. I <br />(3) Appropriate action includes enforcement or other action authorized under the State program <br />to cause the violation to be corrected. <br />(4) Good cause includes. (i) Under the State program, the possible violation does not exist. <br />On the basis of the issuance of a NOV to Basin, OSM finds that your response to our ten-day <br />notice is appropriate action! <br />Sincerely, <br />James Fulton <br />Chief, Denver Field Division <br />TAKE PRIDES <br />I NAMERICA--;;* <br />EXHIBIT I
The URL can be used to link to this page
Your browser does not support the video tag.