Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task #: 67a State : Colorado Permit/job #: C1982056 <br />Date : 0713112009 County:Routt Abbreviation :none <br />User: JHB Site : Foidel Creek Mine Filename : C056-67a <br />Permit or other job action : Tr67 <br />Task description : Haul 567,824 cy cover material on to refuse pile <br />HOURLY EQUIPMENT COST <br />Shift basis : 2 per day <br />Equipment Description <br />Scraper work team -Scraper : Cat 657E w/push-pull <br />-Push dozer: NA <br />Support equipment -Load area : NA <br />-Dump area : Cat D10R - 10SU (2005) <br />Road maintenance -Motor grader : CAT 140H <br />-Water truck : Water Tanker, 5, 000 Gal. <br />Cost Bre <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume : 567,824 CCY factor <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA dozer grader misctruk <br />% Utilization-machine : 100 NA NA 100 25 25 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $72.48 NA NA $49.02 $17.20 $14.72 <br />Operating cost/hour : $265.70 NA NA $169.20 $11.97 $11.03 <br />Ripper op. cost/hour : NA NA NA $0.00 $0.00 NA <br />Operator cost/hour : $30.16 NA NA $35.16 $28.64 $34.09 <br />Unit subtotals : $368.33 NA NA $253.39 $57.81 $59.84 <br />Number of units : 6 0 0 1 1 1 <br />Group subtotals : Work : $2,210.01 Support: $253.39 Maintenance : $117.65 <br />Source of quantity take-off :permit p. 2.05-97.3 <br />Source of estimated swell factor : caterpillar handbook <br />Total work team cost/hour : $2,581.05 <br />Loose <br />1.125 volume : 638.802 LCY