Laserfiche WebLink
<br />ADJUSTED COSTS Ownership Costs <br /> <br />Depreciation CFC Overhead Overhaul and Operating Costs sheet 2 of 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost : $7.84 NA NA NA NA NA NA NA NA NA NA <br />Econ.life -Machine and Attach. No. 1 : $7.84 NA NA $2.23 $6.14 $2.01 $5.41 NA NA NA NA <br />-Attachment No. 2: NA $0.00 $0.00 $0.00 $0.00 NA NA NA NA <br />Annual usage : $11.83 $6.82 $9.83 NA NA NA NA NA NA NA NA <br />Double shifts : $8.88 $3.41 $4.92 NA NA NA NA NA NA NA NA <br />Triple shifts : $7.89 $2.27 $3.28 NA NA NA NA NA NA NA NA <br />Mech. Ibr.-Machine and Attach. No. 1: NA NA NA $1.85 NA $1.66 NA NA NA NA NA <br />-Attachment No. 2: NA NA NA $0.00 NA $0.00 NA NA NA NA NA <br />Fuel/tube -Machine and Attach. No. 1: NA NA NA NA NA NA NA $24.83 $4.45 $3.08 $0.45 <br />Attachment No. 2 : NA NA NA NA NA NA NA $0.00 $0.00 $0.00 $0.00 <br />ADJUSTED COST SUBTOTALS <br /> <br />Depreciation Ownership Costs <br /> <br />CFC <br /> <br />Overhead <br />Overhaul <br />Labor Parts Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuel Lube Tires G.E.C. <br />Basic Machine and Attachments No. 1 and No. 2: Basic Machine and Attachment No. 1 <br />Single shifts : $11.83 $6.82 $9.83 $1.85 $6.14 $1.66 $5.41 $24.83 $4.45 $3.08 $0.45 <br />Double shifts : $8.88 $3.41 $4.92 ttachment: <br />Triple shifts : $7.89 $2.27 $3.28 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />HOURLY OPERATOR WAGES Base Fringe F.I.C.A. Unempl. Wk.Comp . Total <br /> Rate Benefits 7.65% 6.20% 9.80% ($/hr) Shift Differential Colorado Labor zone : 2 <br />Grader - rough blade $16.39 $8.22 $1.25 $1.02 $1.61 $28.49 Day : $0.00 Two shift per day average : $0.15 <br />Grader - finish blade $16.39 $8.22 $1.25 $1.02 $1.61 $28.49 Swing : $0.30 Three shift per day average : $0.25 <br />Mechanic $21.82 $8.22 $1.67 $1.35 $2.14 $35.20 Night : $0.45 <br />HOURLY EQUIPMENT COST SUMMARY Ownership Operating and Overhaul <br />Machine Attachments Operator Total <br />Cost/hr ($) <br />Single shifts : $28.49 $47.87 $0.00 $28.49 $104.85 <br />Double shifts : $17.20 $47.87 $0.00 $28.64 $93.71 <br />Triple shifts : $13.44 $47.87 $0.00 $28.74 $90.05 <br /> <br />QUIPMENT PERFORMANCE DATA <br />ascription Type Struck <br />Capacity (cy) Heaped <br />Capacity (cy) Weight <br />(UST) Weight <br />(MT) Length <br />(ft) Width <br />(ft) Height <br />(ft) Min. turning <br />circle (ft) Horsepower <br />(fhp) Fuel <br />type <br />AT 140H NA NA NA 14.94 NA 32.83 8.08 10.25 48.50 165.00 Diesel <br />'oldboard NA NA NA NA NA NA 12.00 2.00 NA NA NA <br />A NA NA NA NA NA NA NA NA NA NA NA <br />ravel speeds (mph): 1st (or max. 2nd 3rd 4th 5th 6th 7th 8th Minimum dump Max. dump <br />Forward : 2.2 3.0 4.3 6.0 9.4 12.8 17.6 25.5 clearance (ft.) height (ft.) <br />Reverse : 1.7 3.2 4.7 7.4 13.9 20.2 NA NA NA NA <br />oader bucket type or Compaction Maximum vertical Max. horiz. Excavator bucket capacity (cy) Lift capacity (lbs) Max.dig/rip Shank No. <br />ompactor drum type width/pass (ft.) reach height (ft.) reach (ft) small medium large optimal max. reach depth (ft.) spacing shanks <br />IA NA NA NA NA NA NA NA NA 1.52 NA NA <br />