My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-08-06_REVISION - C1982056 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2009-08-06_REVISION - C1982056 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:49:30 PM
Creation date
8/6/2009 2:33:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
REVISION
Doc Date
8/6/2009
Doc Name
Expansion Adequacy Concerns & Attached Cost Estimate
From
DRMS
To
Twentymile Coal Company
Type & Sequence
TR67
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADJUSTED COSTS Ownership Costs <br /> <br />Depreciation CFC Overhead Overhaul and Operating Costs sheet 2 of 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost : $32.34 NA NA NA NA NA NA NA NA NA NA <br />Econ.life -Machine and Attach. No. 1 : $32.34 NA NA $12.72 $31.50 $19.09 $31.75 NA NA NA NA <br />-Attachment No. 2 : NA NA NA NA NA NA NA NA NA <br />Annual usage : $49.67 $26.45 $44.01 NA NA NA NA NA NA NA NA <br />Double shifts : $37.25 $13.22 $22.00 NA NA NA NA NA NA NA NA <br />Triple shifts : $33.13 $8.81 $14.65 NA NA NA NA NA NA NA NA <br />Mech. Ibr: Machine and Attach. No. 1: NA NA NA $10.54 NA $15.81 NA NA NA NA NA <br />-Attachment No. 2 : NA NA NA NA NA NA NA NA NA NA NA <br />Fuel/lube -Machine and Attach. No. 1: NA NA NA NA NA NA NA $142.96 $24.43 $7.43 <br />4 <br />$1.28 <br /> <br />Attachment No. 2 : <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />1 <br />ADJUSTED COST SUBTOTALS <br /> <br />Depreciation Ownership Costs <br /> <br />CFC <br /> <br />Overhead <br />Overhaul <br />Labor Parts Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuel Lube Tires G.E.C. <br />Basic Machine and Attachments No. 1 and No. 2: Basic Machine and Attachment No. 1 <br />Single shifts : $49.67 $26.45 $44.01 $10.54 $31.50 $15.81 $31.75 $142796 $24.43 $7.43 $1.28 <br />Double shifts : $37.25 $13.22 $22.00 ttachment: <br />Triple shifts : $33.13 $8.81 $14.65 NA NA NA NA NA NA NA NA <br />HOURLY OPERATOR WAGES Base Fringe F.I.C.A. Unempl. Wk.Comp. Total <br /> Rate Benefits 7.65% 6.20% 9.80% ($/hr) Shift Differential Colorado Labor zone : 2 <br />Scraper operator (<40cy $17.62 $8.22 $1.35 $1.09 $1.73 $30.01 Day : $0.00 Two shift per day average : $0.15 <br />Scraper operator (40+cy $17.62 $8.22 $1.35 $1.09 $1.73 $30.01 Swing : $0.30 Three shift per day average : $0.25 <br />Mechanic $21.82 $8.22 $1.67 $1.35 $2.14 $35.20 Night : $0.45 <br />HOURLY EQUIPMENT COST SUMMARY Ownership Operating and Overhaul <br />Machine Attachments Operator Total <br />Cost/hr ($) <br />Single shifts : $120.13 $265.70 NA $30.01 $415.83 <br />Double shifts : $72.48 $265.70 NA $30.16 $368.33 <br />Triple shifts : $56.59 $265.70 NA $30.26 $352.55 <br />EQUIPMENT PERFORMANCE DATA <br />Description Type Struck <br />Capacity (cy) Heaped <br />Capacity (cy) Weight <br />(UST) Weight <br />(MT) Length <br />(ft) Width <br />(ft) Height <br />(ft) Min. turning <br />circle (ft) Horsepower <br />(fhp) Fuel <br />type <br />Cat 657E w/push-pull Dual engine with push-pull 32.00 44.00 80.07 72.62 53.08 14.33 15.42 49.67 1045.00 Diesel <br />NA NA NA NA NA NA NA NA NA NA NA NA <br />NA NA NA NA NA NA NA NA NA NA NA NA <br />Travel speeds (mph): list (or max. 2nd 3rd 4th 5th 6th 7th 8th minimum dump Max. dump <br />Forward : NA NA NA NA NA NA NA NA clearance (ft.) height (ft.) <br />Reverse: NA NA NA NA NA NA NA NA NA NA <br />Loader bucket type or Compaction Maximum vertical Max. horiz. Excavator bucket capacity (cy) Lift capacity (lbs) Max.dig/rip Shank No. <br />Compactor drum type width/pass (ft.) reach height (ft.) reach (ft) small medium large optimal max. reach depth (ft.) spacing shanks <br />NA NA NA NA NA NA NA NA NA NA NA NA
The URL can be used to link to this page
Your browser does not support the video tag.