Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task #: 67d State : Colorado Permit/job #: C1982056 <br />Date : 0810312009 County: Routt Abbreviation :none <br />User: JHB Site : Foidel Creek Mine Filename : C056-67d <br />Permit or other job action : Tr67 <br />Task description :Remove 5111.1 CYroad base from access road, dispose in Pit <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />(Equipment Description <br />Scraper work team -Scraper : Cat 657E w/push pull <br />-Push dozer: NA <br />Support equipment -Load area :Cat D9R - 9SU (2005) <br />-Dump area :NA <br />Road maintenance -Motor grader :INA <br />-Water truck :INA <br />Cost Bri <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA dozer NA NA NA <br />% Utilization-machine : 100 NA 100 NA NA NA <br />-Ripper attachment : NA NA 25 NA NA NA <br />Ownerhip cost/hour : $120.13 NA $58.86 NA NA NA <br />Operating cost/hour : $265.70 NA $124.46 NA NA NA <br />Ripper op. cost/hour : NA NA $0.00 NA NA NA <br />Operator cost/hour : $30.01 NA $35.01 NA NA NA <br />Unit subtotals : $415.83 NA $218.34 NA NA NA <br />Number of units : 2 0 1 0 0 0 <br />Group subtotals : Work : $831.66 Support: $218.34 Maintenance : $0.00 <br />Total work team cost/hour : $1,050.00 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 5,111 CCY factor : 1.060 volume : 5.418 LCY <br />Source of quantity take-off :Appendix A, RCE TR67, Road Plan map <br />Source of estimated swell factor : Caterpillar Handbook