Laserfiche WebLink
amec <br />Earth & Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day/Night <br />Date: July 25, 2009 <br />Reporting Period: 07/19/09 through 07/25/09 <br />Days S M T W T F S <br />Work Shifts D D D D D <br /> E N N N - - <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 46°F to 55°F (+/-) High: 77° F to 81°F (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: No delays due to weather. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Clearing and Grubbing <br />1) VLF <br />Tree removal from the east slope of the Phase 5 VLF footprint continued using a CAT 330 <br />excavator and 40-ton articulating haul trucks. The removed trees and slash were placed in the <br />Dump 4 slash stockpile. <br />B) Stripping/Slope Re-contouring <br />1) VLF <br />No work performed during the week. <br />C) Overburden to Stockpile: <br />1) VLF <br />Oversize rock within the Phase 5 VLF fill area was removed from fill areas and hauled to the <br />overburden stockpile area east of the east perimeter road near stations A28+00 (+/-) to A36+00 <br />(+/-). Excess cut material was also hauled to the overburden stockpile. <br />D) Subgrade Preparation <br />1) VLF <br />Subgrade preparation was performed between stations K4+00 (+/-) and K14+00 (+/-), <br />approximately 100 to 300 feet right of centerline and between stations J3+00 (+/-) and <br />Sheet 1 of 7 <br />VLF Weekly Report WE 07.25.09.D.doc