Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />022 State : Colorado Permit/job #: C-1991-078 <br />0810312009 County:Montrose Abbreviation :none <br />JRS Site :Hamilton Mine Filename :C078-022 <br />Permit or other job action :2009 Midterm Review <br />Task description :Replace Topsoil from Stockpile to Areas 1 and 2, Ponds, Ditches and R <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Equipment Description <br />Cost Bre <br />Scraper work team -Scraper : Cat 637G w/push pull <br />-Push dozer:NA <br />Support equipment -Load area : NA <br />-Dump area :NA <br />Road maintenance -Motor grader :INA <br />-Water truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA NA NA <br />% Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $108.62 NA NA NA NA NA <br />Operating cost/hour : $228.10 NA NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $30.01 NA NA NA NA NA <br />Unit subtotals : $366.72 NA NA NA NA NA <br />Number of units : 4 0 0 0 0 0 <br />Group subtotals : Work : $1,466.88 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $1,466.88 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 149,065 LCY factor : NA volume : 149.065 LCY <br />Source of quantity take-off :Division Estimate <br />Source of estimated swell factor : NA