My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-08-03_REVISION - C1991078 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1991078
>
2009-08-03_REVISION - C1991078 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:49:22 PM
Creation date
8/4/2009 2:28:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1991078
IBM Index Class Name
REVISION
Doc Date
8/3/2009
Doc Name
2009 Midterm Review RCE
From
Jim Stark
To
Marcia Talvitie
Type & Sequence
MT4
Email Name
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />022 State : Colorado Permit/job #: C-1991-078 <br />0810312009 County:Montrose Abbreviation :none <br />JRS Site :Hamilton Mine Filename :C078-022 <br />Permit or other job action :2009 Midterm Review <br />Task description :Replace Topsoil from Stockpile to Areas 1 and 2, Ponds, Ditches and R <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Equipment Description <br />Cost Bre <br />Scraper work team -Scraper : Cat 637G w/push pull <br />-Push dozer:NA <br />Support equipment -Load area : NA <br />-Dump area :NA <br />Road maintenance -Motor grader :INA <br />-Water truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA NA NA <br />% Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $108.62 NA NA NA NA NA <br />Operating cost/hour : $228.10 NA NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $30.01 NA NA NA NA NA <br />Unit subtotals : $366.72 NA NA NA NA NA <br />Number of units : 4 0 0 0 0 0 <br />Group subtotals : Work : $1,466.88 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $1,466.88 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 149,065 LCY factor : NA volume : 149.065 LCY <br />Source of quantity take-off :Division Estimate <br />Source of estimated swell factor : NA
The URL can be used to link to this page
Your browser does not support the video tag.