My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-08-03_REVISION - C1991078 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1991078
>
2009-08-03_REVISION - C1991078 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:49:22 PM
Creation date
8/4/2009 2:28:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1991078
IBM Index Class Name
REVISION
Doc Date
8/3/2009
Doc Name
2009 Midterm Review RCE
From
Jim Stark
To
Marcia Talvitie
Type & Sequence
MT4
Email Name
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMENT sheet 2 of 2 <br /> Nearest major city or town within project area region : Ouray <br />Transoortation Cycle Time : Non- Total one-way travel distance : 75.0 miles <br /> Roadable Roadable Average travel speed : 45.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 1.67 1.67 Total non-roadable mob/demob cost $5,591.79 <br />Return time (hours) = 1.67 1.67 * two round trips with haul rig <br />Loading time (hours) = 1.25 NA Total roadable mob/demob cost ** : $0.00 <br />Unloading time (hours) = 1.25 NA •• one round trip, no haul rig <br />Subtotals = 5.83 3.33 <br />JOB TIME AND COST Total job time : 11.67 hours <br /> Total job cost : $5,592 <br />EQUIPMENT HAUL DISTANCE and TIME
The URL can be used to link to this page
Your browser does not support the video tag.