Laserfiche WebLink
ROADABLE EQUIPMENT <br />sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Water Tanker, 2,500 Gal. $62.77 1 $62.77 $62.77 <br />-Fuel Tanker, 4x2, 170 HP $64.71 1 $64.71 $64.71 <br />-tube Truck, 4x2, 170 HP $72.61 1 $72.61 $72.61 <br />-Flatbed Truck, 6x4, 45K GVW $126.55 1 $126.55 $126.55 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $326.63 $326.63 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Grand Junction <br />Transportation Cycle Time : Non- Total one-way travel distance : 120.0 miles <br /> Roadable Roadable Average travel speed : 45.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 2.67 2.67 Total non-roadable mob/demob cost $20,068.95 <br />Return time (hours) = 2.67 2.67 ' two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost " : $1,742.02 <br />Unloading time (hours) = 0.50 NA •• one round trip, no haul rig <br />Subtotals = 6.33 5.33 <br />JOB TIME AND COST Total job time : 12.67 hours <br /> Total job cost : $21,811