Laserfiche WebLink
PROJECT IDENTIFICATION <br />Date : 03-Aug-09 Permit: C-1991-078 Site: Hamilton Mine <br />User: JRS State : Colorado <br /> Filename: C078-000 County: Montrose <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: 2009 Midterm Review <br /> <br />Task Task Description TASK HOURS DIRECT COST <br /> <br />010 Regrade Sediment Pond A Access Road 2.49 $332 <br />011 Regrade Sediment Pond B Access Road 3.94 $525 <br />016 Regrade Sediment Pond A 2.44 $554 <br />017 Regrade Sediment Pond B 7.80 $1,773 <br />021 Regrade Collection Ditches 7.38 $984 <br />022 Replace Topsoil from Stockpile to Areas 1 and 2, Ponds, Ditches and Roads 89.69 $131,560 <br />023 Replace Topsoil from Stockpile to Area 3 17.48 $25,646 <br />040 Reseed Disturbed Areas 111.20 $128,395 <br />042 Mobilize/Demobilize Equipment for Remaining Reclamation 12.67 $21,811 <br />043 Mobilize/Demobilize Equipment for Site Maintenance 11.67 $5,592 <br />044 Site Maintenance/Rill and Gully Repair 80.00 $5,672 <br />045 Weed Spraying - Assume 50 Acres Every Year for Five Years 125.00 $22,782 <br />046 Plug and Seal Wells AW-1, AW-2, AW-3, BW-1, BW-2 and BW-3 36.00 $4,199 <br /> <br /> <br /> <br /> Direct Cost Total 507.76 $349,825 <br /> <br /> INDIRECT COSTS <br /> <br /> Overhead and Profit <br /> Liability Insurance (2.02% of Direct Costs) $7,066 <br /> Performance Bond (1.05% of Direct Costs) $3,673 <br /> Job Superintendent (at $52.10/hour) 253.88 $13,227 <br /> Profit (10.00% of Direct Costs) $34,983 <br /> <br /> Total Overhead and Profit $58,949 <br /> <br /> Contract Amount (Direct Costs + Overhead and Profit $408,774 <br />jrs Page 1 03-08-09