Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK • <br />PROJECT IDENTIFICATION <br />Task #: 046 <br />Date : 0111312009 <br />User : JRS <br />State : Colorado <br />County: Las Animas <br />Site : New Elk Mine <br />Permit/job# : C-1981-012 <br />Abbreviation :none <br />Filename :C012-046 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Permit Renewal 05 <br />Task description :Regrade Pond 007 <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (C G) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $71.49 NA <br />Operating cost/hour : $103.27 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $207.53 Total fleet cost/hour : $207.53 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 9,120 CCY factor : 1.125 volume : 10,260 LCY <br /> <br />Source of estimated volume :Exhibit 19, pages 15 and 16, Table 23 <br />Source of estimated swell factor : CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 910.5 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shiff/day) <br />Compacted rill or embankment Spoil pile : 0.80 (fnd-rf <br /> Push gradient : 0.90 (Cat HB) <br />Average push gradient : 5.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,500 feet Material weight : 0.87 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,650 lbs/LCY Net correction : 0.35 <br />Weight description-: <br />Decomposed rock - 25% Rock, 75% Earth Adjusted unit production : 319.91 LCY/hr <br /> Adjusted fleet production ::. 319.91 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 32.07 Hours <br />Unit cost : $0.649 /LCY Total job cost : $6,656 <br />is <br /> <br />RN-05 Exhibit 28-46 (Revised 2/16/09)