Laserfiche WebLink
PART II <br />Page No. 33 <br />Permit No.: CO-0000906 <br />• ii) The Division finds that the permittee has shown reasonable grounds consistent with the Federal and State statutes <br />and regulations for such modifications or termination; <br />iii) Requirements of Section 61.15 of the Colorado Discharge Permit System Regulations have been met, and <br />iv) Requirements of public notice have been met. <br />d. Permit modification (except for minor modifications), termination or revocation and reissuance actions shall be subject to <br />the requirements of Sections 61.5(2), 61.5(3), 61.6, 61.7 and 61.15 of the Colorado Discharge Permit System <br />Regulations. The Division shall act on a permit modification request, other than minor modification requests, within 180 <br />days of receipt thereof. Except for minor modifications, the terms of the existing permit govern and are enforceable until <br />the newly issued permit is formally modified or revoked and reissued following public notice. <br />e. Upon consent by the permittee, the Division may make minor permit modifications without following the requirements of <br />Sections 61.5(2), 61.5(3), 61.7, and 61.15 of the Colorado Discharge Permit System Regulations. Minor modifications to <br />permits are limited to: <br />i) Correcting typographical errors; or <br />ii) Increasing the frequency of monitoring or reporting by the permittee; or <br />iii) Changing an interim date in a schedule of compliance, provided the new date of compliance is not more than 120 <br />days after the date specific in the existing permit and does not interfere with attainment of the final compliance date <br />requirement; or <br />• iv) Allowing for a transfer in ownership or operational control of a facility where the Division determines that no other <br />change in the permit is necessary, provided that a written agreement containing a specific date for transfer of permit <br />responsibility, coverage and liability between the current and new pernmittees has been submitted to the Division; or <br />v) Changing the construction schedule for a discharger which is a new source, but no such change shall affect a <br />discharger's obligation to have all pollution control equipment installed and in operation prior to discharge; or <br />vi) Deleting a point source outfall when the discharge from that outfall is terminated and does not result in discharge of <br />pollutants from other outfalls except in accordance with permit limits. <br />f. When a permit is modified, only the conditions subject to modification are reopened. If a permit is revoked and reissued, <br />the entire permit is reopened and subject to revision and the permit is reissued for a new term. <br />g. The filing of a request by the permittee for a permit modification, revocation and reissuance or termination does not stay <br />any permit condition. <br />h. All permit modifications and reissuances are subject to the antibacksliding provisions set forth in 61.10(e) through (g). <br />6. Oil and Hazardous Substance Liability <br />Nothing in this permit shall be construed to preclude the institution of any legal action or relieve the permittee from any <br />responsibilities, liabilities, or penalties to which the permittee is or may be subject to under Section 311 (Oil and Hazardous <br />Substance Liability) of the Clean Water Act. <br />7. State Laws <br />Nothing in this permit shall be construed to preclude the institution of any legal action or relieve the permittee from any <br />• responsibilities, liabilities, or penalties established pursuant to any applicable State law or regulation under authority granted <br />by Section 510 of the Clean Water Act.