Laserfiche WebLink
<br />• List of Tables <br /> Page <br />Table 1 Organizations Supplying Technical and Supplemental Information 2.03-2 <br />Table 2 Permits and Licenses ............................................................. 2.03-9 <br />Table 3 Table Deleted by Transfer of Ownership <br />Table 4 Acreage of Land Use to be Affected .......................................... 2.04-2 <br />Table 5 Sulfur Form Analysis .............................................................. 2.04-11 <br />Table 6 Lithologic Descriptions for the Refuse Disposal Area ..................... 2.04-14 <br />Table 7 Joint Orientation for the Refuse Disposal Area ............................. 2.04-18 <br />Table 8 Results of Well Survey ............................................................ 2.04-19 <br />Table 9 Results of Windmill Survey ...................................................... 2.04-20 <br />Table 10 Results of Stock Pond Survey .................................................. 2.04-21 <br />Table 10A Existing Water Rights in the Permit and Adjacent Areas ................ 2.04-25b <br />Table 11 Preliminary Spring/Seep Survey Locations ................................ 2.04-26 <br />Table 12 Result of Field Spring and Seep Inventory ................................... 2.04-27 <br />Table 13 Climatological Data -Trinidad, Colorado ..................................... 2.04-34 <br />Table 14 Climatological Data -North Lake, Colorado ................................. 2.04-35 <br />Table 15 Soil Analysis Results for RDA .................................................. 2.04-38 <br />Table 16 Suitability Criteria for Topsoil .................................................... 2.04-39 <br />Table 17 Results of Soil Analysis for RDA ............................................... 2.04-41 <br />Table 18 Mining Equipment List ............................................................ 2.05-3 <br />Table 19 Surface Facilities List ............................................................. 2.05-7 <br />Table 20 Ditch Data ............................................................................ 2.05-11 <br />• Table 21 Culvert Sizing ........................................................................ 2.05-14 <br />Table 22 Culvert Sizing Nomograph ....................................................... 2.05-15 <br />Table 23 Sediment Pond Dimensions .................................................... 2.05-16 <br />Table 24 Soil Balance for Refuse Disposal Area ....................................... 2.05-20 <br />Table 25 Table Deleted by MR-79 <br />Table 25A Soil Test Parameters ............................................................. 2.05-46a <br />Table 25B Criteria to Establish Overburden Suitability ................................. 2.05-46a <br />Table 26 Ground Cover Mixes for Respective Post-Mining Land Uses........... 2.05-48 <br />Table 26A Comparison of New Elk Slurry Water Quality with Water Quality <br /> Standards ............................................................................ 2.05-85a <br />Table 26B Projections of the Flooded Workings Water Quality following <br /> Recycling of Thickener Water for Key Constituents ....................... 2.05-86 <br />Table 26C Impacts to the Middle Fork of the Purgatoirie from Discharges from <br /> the Flooded Workings ............................................................. 2.05-89 <br />Table 27 Hydrology Monitoring Requirements ........................................... 2.05-90b <br />Table 28 Water Quality Parameter Sample Suite ...................................... 2.05-90c <br />• <br />TR-47 <br />Page iv <br />(revised 1/24/03) <br />