Laserfiche WebLink
<br />2.04.5 General Description of Geology and Hydrology 2.04-8 <br />2.04.6 Geology Description 2.04-9 <br />2.04.7 Hydrology Description 2.04-17 <br /> Groundwater Information 2.04-17 <br /> Surface Water Infotmation 2.04-24 <br /> Alternative Water Supply Information 2.04-33 <br />2.04.8 Climatological Information 2.04-33 <br />2.04.9 Soils Resource Information 2.04-33 <br />2.04.10 Vegetation Information 2.042 <br />2.04.11 Fish and Wildlife Resources Information 2.04-47 <br />2.04.12 Prime Farmland Investigation 2.04-52 <br />RULE 2.05 Application for Permit for Surface or Underground <br /> Mining Activities <br />2.05.1 Objectives 2.05-1 <br />2.05.2 Operation Plan -Life of Operation 2.05-1 <br /> Production Methods and Equipment 2.05-1 <br /> Operation Description 2.05-4 <br />2.05.3 Operation Plan -Permit Area 2.05-5 <br />• Production Methods and Equipment 2.05-5 <br /> Operation Description 2.05-5 <br /> Mine Facilities 2.05-6 <br /> Ponds, Impoundments & Diversions 2.05-9 <br /> Topsoil 2.05-19 <br /> Overburden 2.05-23 <br /> Coal Handling Structures 2.05-23 <br /> Coal Processing Waste and Non-Coal Processing Waste 2.05-26 <br /> Underground Development Waste 2.05-43 <br /> Return of Coal Processing Was[e [o Abandoned Workings 2.054 <br />2.05.4 Reclamation Plan 2.05-44 <br /> Timetable 2.054 <br /> Reclamation Cost Estimate 2.05-45 <br /> Backfilling and Grading 2.05-45 <br /> Topsoil Removal, Storage and Redistribution 2.056 <br /> Revegetation 2.057 <br /> Sealing and Managing Mine Openings 2.05-54 <br />2.05.5 Post-Mining Land Uses 2.05-54 <br />2.05.6 Mitigation of Surface Coal Mining Operation Impacts 2.05-55 <br /> Air Pollution Control Plan 2.05-55 <br /> Fish and Wildlife Plan 2.05-57 <br />. Protection of Hydrologic Balance 2.05-58 <br /> ii (revised 9/29!98) <br />