My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-22_PERMIT FILE - C1981041A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981041A
>
2009-05-22_PERMIT FILE - C1981041A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:46:52 PM
Creation date
8/4/2009 10:22:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041A
IBM Index Class Name
Permit File
Doc Date
5/22/2009
Section_Exhibit Name
Tab 14 Appendix 14-6 Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Roadside Borrow Area Drainage <br />North Portal Haul Road No. 2 Drainage into Coal Canyon <br />Calculation Rational and Results Summary <br />Rational: <br />Calculated using SEDCADT"' 4 for Windows <br />Areas, slopes and flow paths obtained from electronic media. <br />~1 <br />LJ <br />• <br />The soil map, Exhibit 23 shows the soil type as 66 - "Torriorthents, Warm-Rock <br />Outcrop" and 4 "Barx Clapper complex". Generally the soil samples for this and <br />other disturbance areas indicates the soil is sandy to silty loam (Tab Section 9) <br />which equates to a "B" soil group. Clapper has a published soil group of "B" in <br />Table B-1 of Peak Flows in Colorado. The following CN's were used in the <br />calculations: <br />Roadside Borrow Area <br />64 - B soil group, sage-grass with 20% cover. <br />86 - B soil group, fallow, bare soil. Used for topsoil piles, ponds <br />and reclaimed slopes. <br />North Portal Haul Road <br />89 -Curve No. Used in Appendix 13-1 for road ditches. <br />10 year 24 hour storm event of 1.4" used for all run-off calculations <br />The ditch layout and sizing for the Roadside Borrow Area are presented on Exhibits 6C <br />and 26. The ditch segments, "O" & "P" were designed the same based on the largest of <br />the three drainage areas. Ditch sizes are shown on Exhibit 26 and on pages 14-6-108 <br />& 109. <br />The North Portal Haul Road No. 2 V-ditch flows into Coal Canyon on a 2H:1 V slope at <br />the location where the dip section was removed. The ditch is located immediately south <br />of Coal Canyon and North of Excel's dozer shed and fueling station. Ditch layout and <br />size are presented on Exhibit 6C and on pages 14-6-115 & 116. <br />The SEDCAD ca <br />117 were preparF <br />presented is true <br />Icul~b a ~fi~~~,grmation presented on pages 14-6-103 through 14-6- <br />~ ~,,tf~~nonth of September 2002, and the information <br />;d °c~`r° <br />~ °~,ro~`trect to~~°f3i~st of my knowledge and belief. <br />;~+%° Jas Eoaver, P.E. t5ate <br />~st~re,~t~~essional Engineer <br />rado No. 19230 <br />14-6-103 (New 09/02) <br />
The URL can be used to link to this page
Your browser does not support the video tag.