My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-22_PERMIT FILE - C1981041A (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981041A
>
2009-05-22_PERMIT FILE - C1981041A (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:46:52 PM
Creation date
8/4/2009 10:17:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041A
IBM Index Class Name
Permit File
Doc Date
5/22/2009
Section_Exhibit Name
Tab 13 Operation Plan-Permit Area
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Drainage -Most of the road is within the RSN drainage system. Three 18" culverts <br />along this road convey surface runoff under the road on its way to sediment ponds. <br />See Appendix 3-2 for intemal drainage design. For the creek crossing a dip section <br />with 6-36" CMP culverts encased in concrete convey low flows under the road. The <br />concrete surface conveys high flows across the road without eroding the road. See <br />Appendix 13-1 or design of drainage through and across the dip section. Straw bale <br />dikes are installed along each edge of the dip section to settle and filter roadway <br />drainage before it goes to Coal Creek. Ditches not includes in the intemal drainage <br />include ditches along the roadway leading to the dip section. Design for these ditches <br />is given in Appendix 13-1. <br />Surfacing -Specifics on the roadbase are unknown. The surface of the road is 3/4" <br />roadbase gravel. <br />Maintenance -The road is watered regularly during use and graded as necessary. Mg- <br />CI is applied to the surface once or twice a year to reduce the watering requirements. <br />When grading the road, the silt deposited on the dip section is graded off and the bales <br />are replaced as necessary. <br />Structure <br />Location <br />Construction Dates <br />Haul Road 3 <br />(Formerly Access <br />Roads #4a & b) <br />Overland Conveyor &UTL 1978 <br />Exhibits 10C and 11 C <br />Description -This road includes portions of the Overland Conveyor and the Unit Train <br />Loadout (UTL) operations area over which coal was hauled onto and away from the <br />UTL. The road extends from the public road near the Colorado River bridge at Cameo <br />along the rail spur and through the rail loop to the north end of the loop for a total length <br />of approximately 5500'. This road will remain as access to the property for <br />industrial/commercial operations. <br />Design and Construction -The road was installed across areas graded during <br />construction of the UTL and rail spur across relatively level land near the river. Minor <br />cuts and fills were made to cross the Coal Creek and the rail loop. The maximum <br />grade is 10% for 40' with the majority being less than 0.5%. The roadway width varies <br />from 20 to 40' and averages approximately 30'. Figure 13-2 is a typical cross section <br />for the design of this road. <br />Drainage -Most of the road is within the Overland Conveyor and the UTL drainage <br />system. Inside the UTL loop, runoff will be directed to Pond 1 & 2. For the creek <br />crossing a dip section with 6 - 30" CMP culverts encased in concrete convey low flows <br />under the road. The concrete surface <br />PR-4 T13-2-2 Rev. 07/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.