Laserfiche WebLink
SNOWCAP COAL COMPANY, INC. <br />Tabie 13-1 <br />Permit Area Building and Structure Inventory <br />ROADSIDE NORTH -PORTAL & SURFACE FACILITIES Continued <br />Building or Structure Construction Description <br /> Date <br />Haul Road 2 1981 1/2 mile coal haul road, one way, 1'/" gravel <br /> base. Removed 2002. <br />Dip Section 1981 Low water bridge with 6-36" culverts. Removed <br /> 2002 <br />Fan 1979 6' diameter exhaust fan. Removed 2002. <br />Powder Magazine 1977 7'x7'x7' precast concrete box with steel door. <br /> Removed 2002. <br />Cap Magazine 1977 3.3'x3.3'x3.3' precast concrete box with steel <br /> door. Removed 2002. <br />Fuel Island 1997 42'x11'x6" concrete pad with 1000 and 6000 <br /> allon surtace tanks. Removed 2001 <br />Bermed Fuel Tank 1996 5000 gallon fuel tank installed within a dirt <br /> termed spill containment area. The berms area <br /> will be approximately 15'x25'x2' inside and will be <br /> lined with an impervious geotextile liner covered <br /> with ravel. Removed 2001. <br />Screening & Crushing 1995 SUuctural steel building 20'x32'x40' high to house <br /> a raw coal sizing screen and a coal crusher. <br /> Removed 2002. <br />Truck Loadout System 1995 One 36"x120' long conveyors that convey coal to <br /> one new 50 ton truck loadout bin and one <br /> relocated 50 ton truck loadout bin all of steel <br /> construction, approximate dimensions of both <br /> bins 1 B'x13'x30' hi h. Removed 2002. <br />Sampling System 1995 Coal quality sampling system consisting of a <br /> sweep arm sampler mounted on the 36" <br /> conveyors and aself-contianed sampling system <br /> buildin 8'x8'x20' Ion .Removed 2001. <br />High Ash Coal Conveyor and 1997 42"x67' long belt that extends from the raw coal <br />Stacker Tube stacking tube to a 10' diameter by 42' high <br /> stackin tube. Removed 2001. <br />Sediment Pond #13 2002 Refer to Section 2.05.3 4 for detail. <br />• T13-1-2 <br />(Rev 10/05) <br />