Laserfiche WebLink
SOUTH FAN <br />The south fan reclaimed runoff is controlled by alternate sediment control <br />measures. Three silt fences are utilized at the reclaimed south fan area and one <br />silt fence is located at the reclaimed south fan borrow area. See Exhibit SLA 6- <br />009, Table 13-5 and Appendix 14-6. A grass filter design is presented in <br />Appendix 14-6 beginning on page 147. The grass filter design demonstrates the <br />silt fences located at the south fan pile no. 10, south fan pile no. 11 and the <br />south fan borrow area are no longer required. <br />2 WEST PORTALS <br />The reclaimed 2 West Portals is in a small confined area with minimal <br />disturbance. See Exhibit 58. Runoff from individual reclaimed areas associated <br />with the 2 portals, the reclaimed overburden stockpiles and the reclaimed <br />substation is controlled by berms and silt fences. Details of these controls are <br />presented in Table 13-5 with back up calculations in Appendix 14-6. A grass <br />filter design is presented in Appendix 14-6 beginning on page 147. The grass <br />filter design demonstrates the silt fences located at the reclaimed overburden <br />stockpiles and the reclaimed substation are no longer required. The drainage <br />channel between the two portals was permanently relocated as shown on Exhibit <br />58. <br />CAMEO REFUSE DISPOSAL AREA 3 (CRDA 3) <br />The Operator does not plan to construct CRDA-3 since the mine has been <br />sealed. <br />13-14 (Rev. 11 /08)