Laserfiche WebLink
s s i <br /> Table 67 <br /> RECLAMATION TIMETABLE <br /> P ortal Portal Portal <br />Activity N o. 5 No. 5A No, 9 Fac ilities <br />Removal of Structures 90 days 60 days 90 days 120 days <br />and Facilities I <br />Portal Sealing 30 days 30 days 30 days N/A <br />Topsoil Removal 10 days <br />Rough Backfilling 60 days 60 days 30 days 10 days <br />and Grading <br /> <br />Smooth Grading <br />5 <br />days <br />5 days <br />5 <br />days <br />5 I <br />days <br />Scarifying 2 days 2 days 2 days 5 days <br />Redistribution of Topsoil 10 days 10 days 10 days 10 days <br />Revegetation and Mulching 3 days 3 days 3 days 3 days <br /> i <br />I <br />i <br />i <br />